Technical article · Manufacturers

Weishaupt and section 14a EnWG

Weishaupt describes control by the grid operator in the installation and operating instructions, not on a section 14a page of its own. What you need to know is there: power limitation via a controller input, factory-set to 4.2 kW – and a clear warning that matters when wiring the control box.

Basis
installation and operating instructions Biblock WBB 12 … WBB 20 (indoor unit), 83315301, edition 2026-09
Route
power limitation via one input or under SG Ready 1.1
Factory setting
4.2 kW, adjustable from 1.0 to 30.0 kW
Digital interface
not described for section 14a in the instructions
Status
October 2026 · primary sources below, with the date each was checked
Author
Julian Haag, state-certified electrical engineering technician

The power limitation

The instructions describe the function like this: “The energy supply company can initiate a reduction of power consumption to stabilise the grid.” When power limitation is active, “the electrical power of the heat pump including the electric heaters is limited to the set value”. The value can be set between 1.0 and 30.0 kW; the factory setting is 4.2 kW.

It is triggered via the controller's inputs, in two ways:

The controller also has the classic utility lockout, in which heating and cooling as well as hot water charging are blocked while frost protection is maintained.

No contactor in front of the heat pump

The instructions warn explicitly: “The heat pump must not be disconnected from the power supply during the utility lockout. Switching off via a utility contactor can damage the heat pump, cause refrigerant to escape and shorten the service life of the heat pump.” It is only switched off via the designated utility contact.

With section 14a that is more than a detail. Control boxes have relay contacts, and the obvious wiring – a contactor in the supply line – is exactly the wrong one for this heat pump. The control box contact belongs on the controller input. For the Biblock WBB 12 there is one more point: if the utility lockout works with load disconnection, a heating band must be installed on the compressor (accessory) before the “utility load disconnection” parameter is activated.

Weishaupt Biblock: connecting the control box correctly Two variants. Top, wrong: the control box switches an EVU contactor that cuts the supply, and the heat pump is left unpowered; Weishaupt warns of damage, refrigerant leaks and a shorter service life. Bottom, right: the control box contact goes to a controller input or the SG Ready inputs SGR1 and SGR2, the heat pump stays powered and is limited including the electric heaters, to 4.2 kilowatts by default, adjustable from 1.0 to 30.0 kilowatts. Wrong: contactor in the supply control box EVU contactor cuts the supply heat pump unpowered Weishaupt: damage, refrigerant leak, shorter service life Right: contact to the controller input control box controller input or SGR1/SGR2 heat pump stays powered limited incl. electric heaters: 4.2 kW default, 1.0–30.0 kW
Based on the installation and operating instructions Biblock WBB 12 … WBB 20, 83315301 1/2026-09, ch. 5 and 6.7.7. The warning about the EVU contactor is worded there verbatim, see the quote above.

Which value to set

The factory setting of 4.2 kW matches the minimum power the grid operator must allow under direct control (clause 4.5.1 of the ruling). For controllable devices with a grid connection capacity above 11 kW, however, the minimum power is the grid connection capacity times 0.4. The parameter then belongs correspondingly higher – the range up to 30 kW allows for that. Because the electric heaters are limited as well, what counts is the power of the whole installation.

And the digital interface?

For control by the grid operator, the instructions only describe the inputs, no digital interface. The Evoblock product page also lists “SG Ready”. For section 14a that is enough. For a newly installed heat pump that is to be subsidised, not necessarily – see the next section. Only written information from Weishaupt about the specific unit helps here.

What the subsidy requires

For section 14a, any route the manufacturer names is enough. For subsidising a newly installed heat pump it is not: under number 3.4.3, the BEG EM directive of 17 August 2026 requires a “digital interface for grid-oriented control” that is “interoperable” and enables control under section 14a “including the status and feedback information required for it”. A contact that opens or closes provides no feedback. From 1 July 2027, the interface of newly installed heat pumps must also follow a format in line with the Code of Conduct for Energy Smart Appliances, “for example EEBUS in accordance with VDE-AR-E 2829-6”.

Whether a specific installation is subsidised is decided by the funding body, not the manufacturer. The connection routes compared: Running a heat pump on electricity prices.

Frequently asked questions

How does a Weishaupt heat pump meet section 14a EnWG?

According to the installation and operating instructions of the Biblock WBB 12 to WBB 20, via an input of the controller: with the power limitation function – via one input or, under SG Ready 1.1, via inputs SGR1 and SGR2 – the electrical power of the heat pump including the electric heaters is limited to a set value. The factory setting is 4.2 kW.

May the Weishaupt heat pump be switched off via a contactor?

No. Weishaupt warns that switching off via a utility contactor can damage the heat pump, cause refrigerant to escape and shorten its service life. The heat pump may only be switched off via the designated utility contact.

Which value do I set for the power limitation?

The one the grid operator must at least allow. Under direct control, the Bundesnetzagentur's ruling sets this at 4.2 kW, which is also the factory setting. If the grid connection capacity is above 11 kW, the minimum power is the grid connection capacity times 0.4; the parameter goes up to 30 kW.

Sources

The manufacturer information comes exclusively from the manufacturer's own documents, each with its date and the date it was checked. Manufacturer documents change with every firmware release; what counts is the version valid at the time of installation. Quotations from German documents are our translation.

This article reproduces manufacturer information; it replaces neither Weishaupt's documentation nor the technical connection conditions of your grid operator. Connection and registration are reserved for a registered electrical contractor. Haag Automation has no business relationship with Weishaupt.

Planning a heat pump and want control, energy management and metering thought through together from the start? Write to me – the initial consultation is free.