Technical article · Section 14a EnWG · Wallbox

Wallbox “section 14a compliant”: what it means and how to retrofit

“§ 14a-konform” is printed on almost every German wallbox data sheet by now, and on its own it says little. What it means is: the wallbox can implement a setpoint from the grid operator. How it does so, whether it needs accessories, and how much charging speed is left during curtailment is not in the brochure but in the Bundesnetzagentur's ruling and in the manufacturer's documents. This page puts the two together and shows how an existing wallbox can be retrofitted.

Mandatory for
private charging points above 4.2 kW commissioned from 1 January 2024, mobile ones included
During curtailment
at least 4.2 kW under direct control; a wallbox that can only switch on and off stops
Routes
wallbox control input · energy management system · upstream contactor
EEBUS
not named for the wallbox itself by any of the six wallbox manufacturers reviewed
Status
October 2026 · primary sources below, with the date each was checked
Author
Julian Haag, state-certified electrical engineering technician

The essentials in one minute

When the wallbox must be controllable

In clause 2.4.1, ruling BK6-22-300 of the Bundesnetzagentur lists as the first group of controllable consumer devices “a charging point for electric vehicles that is not a publicly accessible charging point within the meaning of section 2 no. 5 of the Charging Station Ordinance (LSV)”, with a grid connection capacity of more than 4.2 kW and a connection at low voltage. Clause 3.1 obliges “all operators of a controllable consumer device technically commissioned after 31.12.2023” to take part.

Three clarifications follow that are often missing in practice:

Exceptions are few. Charging points of institutions with special rights under section 35 of the German Road Traffic Regulations, such as police and fire services, are exempt. Wallboxes commissioned before 1 January 2024 are only covered by the new rules if a reduced grid fee under section 14a was already granted for them (clause 10.1); otherwise the ruling does not apply (clause 10.3). A voluntary switch is possible at any time, a switch back is not (clause 10.4). The details are in the article Section 14a EnWG for existing systems.

The hardship rule in clause 10.6 for devices that “demonstrably cannot be controlled technically” practically never helps with wallboxes. The reasoning says impossibility is ruled out if the device “can be limited in its draw or switched off in some other way”, and gives the upstream contactor as an example that can “in principle be used for all categories of devices covered by this ruling”. In addition, the rule only applies to devices commissioned by 31 December 2026.

Staying below 4.2 kW to avoid control means giving up the reduced grid fee, and a smaller fuse alone does not change the grid connection capacity. Why is explained in the article The 4.2 kW in section 14a EnWG.

Notification and approval

Independently of section 14a, the Low Voltage Connection Ordinance (NAV) applies: charging devices for electric vehicles “must be notified to the grid operator before they are commissioned”. If the total rated power exceeds 12 kilovolt-amperes per electrical installation, commissioning requires the operator's prior consent, and the operator must respond within two months (section 19(2) NAV). An 11 kW wallbox therefore has to be notified, a 22 kW wallbox or two of 11 kW each need consent. Clause 8.1 of the ruling refers to exactly this obligation. How it works at Netze BW is described in Section 14a EnWG at Netze BW.

What “section 14a compliant” means technically

The term appears neither in the Act nor in the ruling. What the ruling sets out are obligations of the operator, and they determine what a wallbox has to be able to do:

There are three ways for the command to reach the wallbox: a potential-free contact of the control box on a control input of the wallbox, a digital interface for which VDE FNN recommends EEBUS as the minimum standard, or an energy management system in between that receives the setpoint and passes it on to the wallbox. The routes are described in detail in Does my device meet section 14a EnWG?

What manufacturers make of this is shown in their documents. Six wallbox manufacturers have their own page here, each with document version and check date:

Wallboxes: route to section 14a control according to the manufacturer
ManufacturerRoute according to manufacturerDuring curtailment
go-epotential-free input (not on the Gemini flex), Modbus TCP via a PLC, contactorset charging current, off with the contactor
Easeecontact on a metering solution with Equalizer, which limits the chargers; EEBUS expressly notconfigured limit
Fronius Wattpilotdigital input (Flex, Home 2.0, not Go 2.0); permanently online in Germanylimited charging current
Heidelberg / AmperfiedModbus via an energy management system, potential-free contactvia EMS 4.2 to 11 kW, via contact 4.2 kW or off
KEBAswitch contact X1, Modbus TCP, OCPP; P30 only from software 1.18 with 6 Asetpoint in amperes
SMAdirect control, on the eCharger via DI 1–4; EEBUS via the Sunny Home Manager 2.0limited charging current

The table shows what the word “compliant” on the data sheet leaves out:

How much charging remains during curtailment

Under direct control, the minimum power per device is 4.2 kW (clause 4.5.1). The reasoning is clear: the grid operator “cannot order a complete switch-off of a controllable consumer device”. The Bundesnetzagentur calculates that at 4.2 kW electric cars can “as a rule be recharged for 50 kilometres in two hours”.

At the wallbox this is set in amperes. KEBA writes in its manual: “Electric vehicles generally require a minimum charging current of 6 A per phase.” Three-phase, that gives 3 × 230 V × 6 A ≈ 4.1 kW, just below the 4.2 kW and with the car still charging. go-e gives 6 A three-phase or 16 A single-phase as the setting, the latter works out at 3.7 kW. During curtailment the wallbox may take less than it is entitled to, but not more.

After curtailment, power does not return all at once. The ruling requires the return to normal to be “gradual” (clause 4.3); KEBA describes for the P40 that charging power is “slowly increased again over a certain period”.

How the wallbox receives the command – and what happens during curtailment
ConnectionDuring curtailmentLegal basis
Control input with adjustable currentkeeps charging at the set value, for example 6 A three-phaseclause 4.5.1
Energy management systemkeeps charging with the share the EMS allocates to the wallboxclauses 4.4 b and 4.5.2
Control input that only blocksdoes not chargeclause 4.6 sentence 2
Contactor upstream of the wallboxwallbox without powerclause 4.6 sentence 2

That a wallbox which only knows on and off stops during curtailment is not a loophole but intended. The reasoning expressly places this choice within the “operator's selection responsibility”: the operator can opt for finely adjustable technology or use “a device with only coarse control (‘on / off’) in favour of low-cost control technology”. How often and for how long grid operators actually curtail is covered in Section 14a in practice: what curtailment does.

Retrofitting: four routes

Retrofitting here means connecting an existing wallbox so that it implements the control box's setpoint. The order runs from the route that dims to the route that only switches off. All work on the meter cabinet and the supply line belongs in the hands of a registered electrical contractor. How cross-section, protection and voltage drop of the supply line fit together is worked through step by step in the cable sizing tool on xmoo.app (in German).

Route 1: use the wallbox's control input

If the wallbox has a potential-free or digital input, the control box's relay contact is wired to it, and the app or the device is set to what should happen when the contact is closed. Three things decide whether this is done properly:

Route 2: an energy management system in between

The second route fits if the wallbox speaks Modbus or OCPP but has no contact input, if the control box only controls digitally via EEBUS, or if several controllable devices sit behind the grid connection. An energy management system then receives the setpoint and passes it on to the wallbox. The manufacturers' documents show how different that can look:

Which form the grid operator accepts is set out in its technical connection conditions. In my view, Home Assistant does not belong in this position: implementing the grid setpoint belongs on a component the grid operator accepts. More on this in the section 14a guide.

Route 3: a contactor upstream of the wallbox

If the wallbox has neither a contact input nor an interface, the classic route remains: a contactor in the supply line, driven by the control box's contact, disconnects the wallbox during curtailment. For devices in use today, the Bundesnetzagentur expressly expects “control via potential-free relay contacts […] or upstream contactors” and considers the contactor usable in principle for all covered devices. go-e lists it as a separate route in its conformity document; settings and any RFID authorisation are retained. go-e names the drawback itself: “no reduction of the charging current”, “only a complete switch-off”.

Two points belong in the planning. The control box contact does not switch the charging current itself but the coil of the contactor or of a coupling relay; the electrician sizes contactor and circuit protection to the wallbox's current. And acceptance includes a real curtailment: check whether charging resumes by itself after the block ends or has to be restarted.

Route 4: replace

Anyone who wants to keep charging during curtailment, whose existing wallbox can only switch off, and who does not want an energy management system, will need a new wallbox. Then the pre-purchase check applies: model series, variant, software version and the interface your own grid operator requires.

The four routes compared
RouteRequirement at the wallboxDuring curtailmentAdditionally needed
1 · Control inputpotential-free or digital inputdimmed or off, depending on settingcontrol line, coupling relay if needed
2 · Energy managementModbus, OCPP, EEBUS or contactdimmed according to allocationEMS accepted by the grid operator
3 · Contactornoneoffcontactor in the supply line, control line
4 · Replace–depends on the new devicenew wallbox

Several wallboxes, plus a heat pump

Because each wallbox is a controllable consumer device of its own, the operator decides for each whether it is controlled directly or via an energy management system (clause 4.4). Under direct control, each device gets its 4.2 kW. Via an EMS there is a joint value under clause 4.5.2, which the operator may use “at its own discretion”: with two devices that is 4.2 + 0.8 × 4.2 = 7.56 kW, with three 4.2 + 2 × 0.75 × 4.2 = 10.5 kW. If a heat pump above 11 kW is involved, the first term changes.

For wallboxes in a group this can be decisive. Amperfied writes that limiting to 4.2 kW via the potential-free contact is “only possible in single operation and not in the internal load management group”. Anyone running two Heidelberg wallboxes in a group who wants to dim rather than switch off therefore needs the energy management route. With Easee, the Equalizer is the point where the limit arrives for all chargers anyway.

Solar surplus charging and section 14a

Many wallboxes are controlled anyway, by solar surplus or by spot price. The ruling settles the relationship clearly: the operator must “ensure technically that, in the event of competing requests from other control measures, in particular market-based load control, the reduction under this ruling always takes precedence” to the extent that the grid operator's setpoint goes further or contradicts them (clause 4.6 sentence 3).

In practice: anyone who also controls the wallbox with Home Assistant, evcc or the manufacturer's app checks at commissioning that none of these controls lifts the limit. evcc states for its load management that the external limit applies to “all modes (smart, fast)”. How evcc and Home Assistant work together is covered in evcc with Home Assistant. How surplus charging itself works is covered in Charging your EV from solar surplus and Charging a car on spot prices.

The record-keeping obligation

Since 1 March 2025, the operator has had to ensure that implementation of a specified reduction “can be demonstrated to the grid operator in a suitable manner in the individual case”. The information must be kept for at least two years and presented to the grid operator in case of justified doubt (clauses 7.2 to 7.4 and 10.7).

The ruling leaves open how, and manufacturers solve it differently. Fronius requires the Wattpilot in Germany to be “permanently connected to the internet” so that implementation can be demonstrated. SMA writes that with the Sunny Home Manager 2.0 “nothing further” needs to be done for this thanks to the EEBUS communication. evcc logs every limit with start, end, type, measured grid power and the limit set, and offers the log as a CSV file. Easee requires every control stage to be tested with a real signal at commissioning and the result to be recorded. Anyone running Home Assistant can also log the curtailments themselves; the long-term statistics for this are described in Long-term data in Home Assistant.

Checklist before registration

  1. Is the wallbox covered? Not publicly accessible, more than 4.2 kW, technically commissioned after 31.12.2023.
  2. What does the grid operator require? Contact or EEBUS, terminal strip, coupling relay: that is in its technical connection conditions. How far requirements diverge is shown by the comparison in the guide.
  3. Which interface does exactly this model have? Manufacturer document with version, not the data sheet.
  4. Which software version? Write it into the commissioning record.
  5. Direct control or EMS? With more than one controllable device, the comparison is worth it.
  6. Current value during curtailment set, for example 6 A three-phase, and locked against changes.
  7. Real function test: switch the contact, read the charging power, check the return, record the result.
  8. Notification or consent under section 19 NAV: up to 12 kVA notify, above that obtain prior consent.

Where the control box goes when there is no room in the meter cabinet is covered in Control box in an old meter cabinet.

Frequently asked questions

Does my wallbox have to be section 14a compliant?

Yes, if it is not publicly accessible, has a grid connection capacity of more than 4.2 kW and was technically commissioned after 31 December 2023. Under clause 3.1 of ruling BK6-22-300 it must then take part in grid-oriented control. Wallboxes commissioned earlier that did not receive a reduced grid fee are not covered, but can switch voluntarily.

Can the grid operator switch my wallbox off?

No. Under direct control it may only reduce the draw to 4.2 kW. If a wallbox can technically only switch on and off, clause 4.6 requires it to go to the next lower possible value, which is then off. The same applies if a contactor is installed upstream of the wallbox.

Is a contactor upstream of the wallbox enough for section 14a?

In principle, yes. In the reasoning of the ruling, the Bundesnetzagentur names upstream contactors as a common way of control today and considers them usable for all covered devices. The drawback: during curtailment the wallbox is disconnected instead of continuing to charge at 4.2 kW. Whether the grid operator has specific requirements for this is set out in its technical connection conditions.

Does section 14a also apply to a mobile wallbox?

Yes. According to the reasoning of the ruling, the term charging point also covers mobile charging devices, because at 11 to 22 kW they can load the grid just as much as fixed ones.

Does my wallbox need EEBUS for section 14a?

Not necessarily. Some grid operators still control via relay contacts, and none of the six wallbox manufacturers reviewed here names EEBUS for the wallbox itself. If the control box only issues its setpoint digitally via EEBUS, an energy management system is needed in between that understands EEBUS and controls the wallbox via Modbus, OCPP or a contact.

How much charging power remains during section 14a curtailment?

Under direct control at least 4.2 kW. Three-phase at 6 A, the usual minimum charging current, works out at around 4.1 kW. The Bundesnetzagentur calculates that 4.2 kW will as a rule recharge enough for 50 kilometres in two hours.

Sources

The legal statements come from the Bundesnetzagentur's ruling and its reasoning, the manufacturer statements from the individual pages, where each document is listed with version and check date. Binding in the individual case are the technical connection conditions of the responsible grid operator and the documentation of the specific wallbox in its software version. Quotations from German documents are my translation.

This article replaces neither the manufacturer documentation nor the technical connection conditions of your grid operator. Connecting and registering a wallbox is reserved for a registered electrical contractor. Haag Automation has no business relationship with any of the manufacturers named.

Your wallbox needs to become controllable, and you want to know beforehand which route suits device and grid operator? Write to me – the initial consultation is free of charge.