Technical article · Manufacturers

SMA and section 14a EnWG

SMA offers both routes the ruling knows: the charging solutions can be controlled directly, and the Sunny Home Manager 2.0, as an energy management system, receives the control box's instruction via EEBus and distributes it. SMA documents both in a technical information sheet, on the product page and in the manuals.

Direct control
SMA EV Charger, SMA eCharger, SMA EV Charger Business
Via EMS
Sunny Home Manager 2.0, EEBus LPC use case, from firmware 2.16.4.R
eCharger
digital inputs DI 1–4 for ripple control receiver or telecontrol device
Manufacturer sources
technical information EnWG14a-TI-de-10 (version 1.0), manuals, sma.de
Status
October 2026 · primary sources below, with the date each was checked
Author
Julian Haag, state-certified electrical engineering technician

Two variants

SMA's technical information shows two routes. With direct intelligent control, the instruction goes from the control unit at the smart meter gateway straight to a single controllable device, such as the wallbox. With control via an energy management system, the Sunny Home Manager 2.0 receives the instruction and distributes it to wallbox, heat pumps, battery and other consumers.

SMA recommends the second variant “especially when using battery storage and/or several controllable consumption devices behind one grid connection point”.

Direct: the charging solutions

SMA writes: “The SMA charging solutions (SMA EV Charger, SMA eCharger and SMA EV Charger Business) support direct control in compliance with section 14a EnWG.” For the SMA eCharger, the operating manual describes the connection: “Digital input DI 1-4 is intended for connecting a ripple control receiver or telecontrol device for control by the grid operator (e.g. to meet the requirements of section 14a EnWG).” So the control box contact belongs on these inputs.

Via the Sunny Home Manager 2.0

“From firmware version 2.16.4.R the Sunny Home Manager 2.0 supports all compatible controllable consumers”, according to the technical information; which ones they are is in the compatibility list for the Sunny Home Manager 2.0. The connection to the control box runs via EEBus with the LPC use case.

Setup

  1. In Sunny Portal, go to “Configuration > Grid system services”, navigate to “Connect FNN control box” and select it.
  2. Activate the grid operator's requirements under “Consumer control under section 14a EnWG”.
  3. Once communication is established, the Sunny Home Manager is in pairing mode. Its SKI must then be registered at the control box – according to the manual, there are two minutes for this. The SKI goes to the metering point operator's installer, who makes it known to the control box via a dedicated app.
  4. The SKI is shown together with the Ship ID as text and QR code; the QR code can be downloaded as a PDF.

The bottleneck here is not the technology but the coordination: pairing needs the metering point operator's installer at the right place at the right time. Downloading the PDF with the QR code in advance and sending it along saves the second appointment.

SMA Sunny Home Manager 2.0: pairing with the control box Four numbered steps: firmware from 2.16.4.R, open configuration and grid system services in Sunny Portal, connect the FNN control box and enable consumer control under section 14a, then register the SKI at the control box. There is a two-minute window for this; SKI and SHIP ID are also available as a QR code PDF. After that the control box sets the value via EEBus LPC, and a failsafe limit applies if the connection drops. 1 Firmware Sunny Home Manager 2.0 from 2.16.4.R 2 Sunny Portal Configuration › grid system services 3 Connect “Connect FNN control box”, enable 14a 4 Pair register the SKI at the control box window: 2 minutes · SKI and SHIP ID also as QR code PDF Then: the control box sets the value via EEBus LPC, failsafe limit applies if the connection drops
Based on Technical Information EnWG14a-TI-de-10 and the Sunny Home Manager 2.0 manual. The metering point operator’s installer registers the SKI with their app; sending the QR code PDF in advance saves a second visit.

What SMA says about failsafe and documentation

How much remains with several devices

On its product page SMA works it out: with control via energy management, “7.56 kW can still be used with two devices and as much as 10.5 kW with three”. That is the formula from clause 4.5.2 of the ruling: 4.2 kW plus (number − 1) × simultaneity factor × 4.2 kW, with a factor of 0.8 for two and 0.75 for three devices – i.e. 4.2 + 0.8 × 4.2 = 7.56 kW and 4.2 + 2 × 0.75 × 4.2 = 10.5 kW. For heat pumps and air conditioners above 11 kW, a different first term applies.

And the battery?

Among the affected devices SMA lists “electrical storage, e.g. the SMA Home Storage battery with grid consumption (feed-in power is not affected)”. That matches the ruling, which covers storage only “with regard to electricity withdrawal (charging)” (clause 2.4.1).

Frequently asked questions

How does SMA implement section 14a EnWG?

SMA names two variants: direct control of a single device – supported by the SMA EV Charger, SMA eCharger and SMA EV Charger Business charging solutions – and control via the Sunny Home Manager 2.0 as an energy management system, which receives the control box's instruction via EEBus (LPC use case).

From which firmware does the Sunny Home Manager 2.0 support section 14a?

According to SMA's technical information, the Sunny Home Manager 2.0 supports all compatible controllable consumers from firmware version 2.16.4.R; which ones they are is in the compatibility list for the Sunny Home Manager 2.0.

Do I need to do anything for the documentation obligation with the Sunny Home Manager?

According to SMA, no: because of the EEBus communication between control box and Sunny Home Manager 2.0, nothing further needs to be done. The obligation itself is in clause 7.2 of the Bundesnetzagentur's ruling and rests with the operator.

Sources

The manufacturer information comes exclusively from the manufacturer's own documents, each with its date and the date it was checked. Manufacturer documents change with every firmware release; what counts is the version valid at the time of installation. Quotations from German documents are our translation.

This article reproduces manufacturer information; it replaces neither SMA's documentation nor the technical connection conditions of your grid operator. Connection and registration are reserved for a registered electrical contractor. Haag Automation has no business relationship with SMA.

Links marked with an asterisk are affiliate links. As an Amazon Associate I earn from qualifying purchases; the price is unchanged for you. What I recommend does not depend on it.

Planning PV with battery storage and want control, grid consumption and metering kept cleanly apart? Write to me – the initial consultation is free.