Technical article · Grid operator

Section 14a EnWG at Syna

Syna GmbH has no separate technical minimum requirements for section 14a. What it requires is in one chapter of its low-voltage TAB, and it differs clearly from the neighbouring grid operators: control cable and isolating relays instead of a control signal terminal strip with EEBUS, and a module 3 that applies only in winter. This page collects what Syna itself writes, each with document and date checked.

Applies to
low-voltage connections in the grid area of Syna GmbH
Interface
control cable to 230 V isolating relays in the connection space; Cat 6 network cable recommended
Existing cabinets
three-point meter field: BKE-AZ adapter plate with space for supplementary applications
Grid fee 2026
module 1: 157.39 € a year incl. VAT; module 3 only in the 1st and 4th quarter
Documents
low-voltage TAB, valid from 01.01.2025; electricity price sheets 2026
Status
October 2026 · primary sources below, with the date each was checked
Author
Julian Haag, state-certified electrical engineering technician

Your electricity bill shows which grid operator is responsible for your connection. The basics are in the guide to section 14a EnWG; Netze BW's requirements are in the article Section 14a EnWG at Netze BW.

The documents

Syna GmbH is part of Süwag; its electricity distribution grid lies in the control areas of TransnetBW and Amprion. Syna has no separate TMA for section 14a of the kind Netze BW or Netze ODR publish. Two documents are decisive:

The federal model text refers to the grid operator's requirements for control in chapter 9.2; chapter 9 of Syna's TAB is explicitly the specification of exactly that passage. Syna also has its own web page on controllable consumption devices (in German).

What counts, and what does not

The TAB name four groups with a grid connection capacity of more than 4.2 kW at low voltage:

According to the TAB, examples of devices that are not controllable consumption devices are direct heaters, night storage heaters and public charging points under the Charging Station Ordinance; they are not controlled. Controllable wallboxes and consumption devices must be permanently connected.

Registration

The TAB are clear on this point: all systems that fall under section 14a must be reported to the grid operator and registered for operation. Registration uses Syna's forms or online portal; the installer sends the complete commissioning notice no later than 14 days before final commissioning via the portal. The declaration of conformity of a charging device is no longer required at registration, but must be provided on Syna's request.

On the module, the price sheet points out that module 2 requires a separate meter and technical metering point for the controllable system. Anyone who wants module 2 should plan the second meter location from the start.

The meter location according to the TAB

This is where the real difference to the neighbours lies. Syna relies on the analogue route with control cable and relays; the digital interface comes on top as a recommendation:

Preparing for control under Syna's low-voltage TAB Diagram. A control cable runs from the controllable device to the installation-side connection space of the meter location. There sit isolating relays rated 230 volts and at least 6 amps, plus a 6 A/10 kA circuit breaker for their supply. The relay wires and L3 are laid individually onto a terminal strip in the space for supplementary applications; the control box is connected there later, as soon as it is available. Until then the relays can be switched with bridges on the terminal strip. As a recommendation, a network cable of at least Cat 6 also runs from the device to a surge protector with an RJ-45 socket in the connection space, for a future digital interface. With one meter field, an additional functional area of 150 by 250 millimetres next to the APZ is mandatory; from two meter fields it is recommended. Controllable device heat pump, wallbox, cooling, battery control cable Cat 6, recommended Connection space (AAR) isolating relays 230 V, ≥ 6 A MCB 6 A / 10 kA for relays Connection space surge protector with RJ-45 socket relay wires + L3 digital, future Suppl. applications (RfZ) terminal strip, wires single until then: bridges allowed Control box installed as soon as available One meter field: zRfZ 150 × 250 mm next to APZ mandatory, recommended from two meter fields.
Preparing for control under chapter 9 of Syna's low-voltage TAB, valid from 1 January 2025. Solid: required. Dashed: recommended. Other grid operators require something else; see the comparison below.

For space in the meter cabinet: on new meter locations with eHZ plug-in technology and a separate space for supplementary applications, an additional functional area of 150 × 250 mm as additional space for supplementary applications next to the APZ is mandatory with one meter field and recommended from two meter fields. With BKE-I in a single-field installation, the TAB require an additional space for supplementary applications of 12 modules. Its supply generally comes from L3, from the unmetered section.

For non-public charging equipment above 4.2 kW, chapter 10.6.4 repeats the principle: connect permanently and install the technical control device “at a later date” according to Syna's requirements, as soon as it is available. The preparation from chapter 9 therefore belongs in the cabinet today.

On the smart meter gateway: where Syna is the default metering point operator, it reads smart metering systems by radio as standard. If reception at the meter location is limited, the connection owner mounts an antenna provided by Syna in a remote position; if radio does not work at all, they provide a ready-to-use LTE terminal antenna connection close to the meter location.

In an existing meter cabinet

For existing meter locations that continue to be used when the customer installation is changed, the TAB are brief: with a meter field with three-point mounting, a BKE-AZ adapter plate with a space for supplementary applications must be installed. The adapter plate is part of the customer installation. In addition, the requirements of the FNN note “Installation of metering systems in existing installations” apply, and the installer must check that the meter location is in a technically safe condition.

That is the opposite of Netze ODR, whose TMA does not mention the adapter plate at all; at Netze BW it is one of three routes. All three routes at Netze BW are in the article Control box in an old meter cabinet.

Grid fees 2026

Anyone who makes no choice is billed under module 1 as the “basic module”. The prices from price sheet 6, incl. VAT:

Syna section 14a grid fees 2026, incl. VAT, consumption without power metering
ModulePriceRequirement
Module 1 – flat ratecredit 157.39 €/yeardefault; never below 0.00 €
Module 2 – energy price4.13 ct/kWh instead of 10.32 ct/kWhseparate meter and technical metering point
Module 3 – low-load tariff, 1st and 4th quarter midnight–6 am1.04 ct/kWhonly with module 1; the price sheet gives no time windows for the 2nd and 3rd quarter
Module 3 – standard tariff, 1st and 4th quarter 6 am–5 pm and 9 pm–midnight10.32 ct/kWh
Module 3 – peak-load tariff, 1st and 4th quarter 5–9 pm16.02 ct/kWh

The standing charge for consumption points up to 100,000 kWh is 108.59 € a year incl. VAT, the energy price 10.32 ct/kWh. According to the price sheet, the module 1 flat rate consists of 80 € incl. VAT for controllability and a stability bonus calculated from the energy price, 3,750 kWh and a factor of 0.2. It adds up: 80 € / 1.19 + 8.67 ct × 3,750 kWh × 0.2 gives the 132.26 € excl. VAT.

Three things stand out. At Syna, module 3 applies in winter, in the 1st and 4th quarter; at Netze ODR it is exactly the other way round, only from April to September. The low-load tariff is at night and amounts to roughly a tenth of the standard tariff; a heat pump or wallbox that runs between midnight and 6 am in winter benefits, while the peak-load tariff in the early evening costs about half as much again as the standard tariff. And the price sheet only says that the time windows must “be billed in at least two quarters of a year”; what applies in summer is not stated explicitly. If in doubt, Syna can clarify.

Which module pays off at which consumption is in the article Section 14a: module 1, 2 or 3?; the grid fee calculator works with your own figures.

Existing systems

For controllable consumption devices that already received a reduced grid fee under the old section 14a before 2024, price sheet 6c applies: energy price 2.84 ct/kWh incl. VAT without a standing charge, plus 21.72 € a year incl. VAT for metering point operation including the ripple control or tariff switching device. The requirements are a separate meter and the possibility for Syna to interrupt the system completely during the specified times.

At the operator's request, a switch to module 1 or 2 is possible. The general rules, including the deadlines, are in the article Section 14a EnWG for existing systems.

Syna, Netze ODR, Netze BW and NHF compared

Four grid operators under section 14a, according to their own documents
SynaNetze ODRNetze BWNHF / NHL
Interfacecontrol cable to 230 V isolating relays; Cat 6 recommendedterminal strip and RJ-45 alwaysRJ-45 always, terminal strip for analogue controlcustomer-owned 230 V coupling relay
Three-point in existing cabinetsBKE-AZ adapter platetwo routes, without BKE-AZthree routes, BKE-AZ one of themfour cases by meter location
RequirementsTAB, from January 2025; no separate TMATMA, August 2026TMA, April 2026TMA, December 2023
Module 1, incl. VAT157.39 €/year132.39 €/year147.56 €/year152.83 €/year
Module 3 low tariffmidnight–6 am, 1st and 4th quarter only11 am–5 pm, April–September only10 am–2 pm, all yearmidnight–6 am, all year

The details on the other three: Section 14a EnWG at Netze ODR, Section 14a EnWG at Netze BW and Section 14a EnWG at NHF and NHL in Heilbronn.

Frequently asked questions

Does Syna have its own technical minimum requirements for section 14a?

Not as a separate document. Syna's low-voltage TAB, valid from 1 January 2025, take effect together with the BDEW federal model text as the technical minimum requirements under section 19 EnWG. What Syna requires for section 14a is in chapter 9 of this TAB.

What must be prepared in the meter cabinet for control at Syna?

A control cable from the device to the installation-side connection space, where isolating relays rated 230 volts and at least 6 amps go, together with a 6 A/10 kA circuit breaker. The relay wires and L3 are laid onto a terminal strip in the space for supplementary applications until the control box arrives. A network cable of at least Cat 6 onto a surge protector with an RJ-45 socket is recommended in addition.

What applies to module 3 at Syna?

According to the 2026 price sheet, the three tariff levels apply in the first and fourth quarter: low-load tariff from midnight to 6 am at 1.04 cents per kilowatt hour incl. VAT, standard tariff from 6 am to 5 pm and 9 pm to midnight at 10.32 cents, peak-load tariff from 5 to 9 pm at 16.02 cents. Module 3 can only be chosen together with module 1. The price sheet gives no time windows for the second and third quarter.

How large is the module 1 credit at Syna?

132.26 euros a year excl. VAT, 157.39 euros incl. VAT, according to the 2026 price sheet. It cannot push the grid fee of a consumption point below 0.00 euros. Anyone who chooses no module is billed under module 1 as the basic module.

Do I need an adapter plate in an old meter cabinet at Syna?

If a meter field with three-point mounting continues to be used when the customer installation is changed, yes. Syna's TAB then require a BKE-AZ adapter plate with a space for supplementary applications. According to the TAB, it is part of the customer installation.

Sources

All statements come from Syna GmbH's documents, each with the date it was checked. In case of deviations, the grid operator's documents in their current version apply. The source documents are in German; quotations are my translation.

Haag Automation has no business relationship with Syna. The grid operator's documents and information are binding.

You are planning a heat pump, wallbox or battery in Syna's grid area and need the single-line diagram for the registration? I can draw it for you – or write to me about control and energy management.