Technical article · Grid operator
Section 14a EnWG at Syna
Syna GmbH has no separate technical minimum requirements for section 14a. What it requires is in one chapter of its low-voltage TAB, and it differs clearly from the neighbouring grid operators: control cable and isolating relays instead of a control signal terminal strip with EEBUS, and a module 3 that applies only in winter. This page collects what Syna itself writes, each with document and date checked.
Your electricity bill shows which grid operator is responsible for your connection. The basics are in the guide to section 14a EnWG; Netze BW's requirements are in the article Section 14a EnWG at Netze BW.
The documents
Syna GmbH is part of Süwag; its electricity distribution grid lies in the control areas of TransnetBW and Amprion. Syna has no separate TMA for section 14a of the kind Netze BW or Netze ODR publish. Two documents are decisive:
- Syna GmbH's low-voltage TAB (technical connection conditions), valid from 1 January 2025. They specify the BDEW federal model text and take effect together with it “as technical minimum requirements (TMA) under section 19 EnWG”. Section 14a is in chapter 9, supplemented for charging equipment in chapter 10.6.4.
- the electricity price sheets 2026, valid from 1 January 2026, with price sheet 6 for controllable consumption devices.
The federal model text refers to the grid operator's requirements for control in chapter 9.2; chapter 9 of Syna's TAB is explicitly the specification of exactly that passage. Syna also has its own web page on controllable consumption devices (in German).
What counts, and what does not
The TAB name four groups with a grid connection capacity of more than 4.2 kW at low voltage:
- heat pump heating systems, explicitly including electric auxiliary or emergency heaters such as immersion heaters,
- non-public charging points for electric vehicles,
- room cooling systems,
- battery storage; the price sheet specifies “with regard to electricity consumption (charging)”.
According to the TAB, examples of devices that are not controllable consumption devices are direct heaters, night storage heaters and public charging points under the Charging Station Ordinance; they are not controlled. Controllable wallboxes and consumption devices must be permanently connected.
Registration
The TAB are clear on this point: all systems that fall under section 14a must be reported to the grid operator and registered for operation. Registration uses Syna's forms or online portal; the installer sends the complete commissioning notice no later than 14 days before final commissioning via the portal. The declaration of conformity of a charging device is no longer required at registration, but must be provided on Syna's request.
On the module, the price sheet points out that module 2 requires a separate meter and technical metering point for the controllable system. Anyone who wants module 2 should plan the second meter location from the start.
The meter location according to the TAB
This is where the real difference to the neighbours lies. Syna relies on the analogue route with control cable and relays; the digital interface comes on top as a recommendation:
- Control cable: from the controllable device to the installation-side connection space of the meter location, connected at the device end.
- Isolating relays in the connection space: 230 V, at least 6 A, wired according to the device's control logic, as normally open or normally closed contact. A 6 A/10 kA circuit breaker for their supply goes into the connection space. How many relays depends on the installation.
- Terminal strip in the space for supplementary applications: until the control box arrives, the relay wires and phase L3 from the circuit breaker are laid there individually and with sufficient length. If needed, the relays can be switched until then with bridges on the terminal strip.
- Network cable as a recommendation: for a standardised digital interface, “as a future or alternative variant”, Syna recommends a network cable of at least Cat 6 in a protective conduit from the device to the connection space, terminated there on a surge protector with an RJ-45 socket.
- Energy management: a customer-owned energy management system is connected via the isolating relays, or via the digital interface as soon as it is available.
For space in the meter cabinet: on new meter locations with eHZ plug-in technology and a separate space for supplementary applications, an additional functional area of 150 × 250 mm as additional space for supplementary applications next to the APZ is mandatory with one meter field and recommended from two meter fields. With BKE-I in a single-field installation, the TAB require an additional space for supplementary applications of 12 modules. Its supply generally comes from L3, from the unmetered section.
For non-public charging equipment above 4.2 kW, chapter 10.6.4 repeats the principle: connect permanently and install the technical control device “at a later date” according to Syna's requirements, as soon as it is available. The preparation from chapter 9 therefore belongs in the cabinet today.
On the smart meter gateway: where Syna is the default metering point operator, it reads smart metering systems by radio as standard. If reception at the meter location is limited, the connection owner mounts an antenna provided by Syna in a remote position; if radio does not work at all, they provide a ready-to-use LTE terminal antenna connection close to the meter location.
In an existing meter cabinet
For existing meter locations that continue to be used when the customer installation is changed, the TAB are brief: with a meter field with three-point mounting, a BKE-AZ adapter plate with a space for supplementary applications must be installed. The adapter plate is part of the customer installation. In addition, the requirements of the FNN note “Installation of metering systems in existing installations” apply, and the installer must check that the meter location is in a technically safe condition.
That is the opposite of Netze ODR, whose TMA does not mention the adapter plate at all; at Netze BW it is one of three routes. All three routes at Netze BW are in the article Control box in an old meter cabinet.
Grid fees 2026
Anyone who makes no choice is billed under module 1 as the “basic module”. The prices from price sheet 6, incl. VAT:
| Module | Price | Requirement |
|---|---|---|
| Module 1 – flat rate | credit 157.39 €/year | default; never below 0.00 € |
| Module 2 – energy price | 4.13 ct/kWh instead of 10.32 ct/kWh | separate meter and technical metering point |
| Module 3 – low-load tariff, 1st and 4th quarter midnight–6 am | 1.04 ct/kWh | only with module 1; the price sheet gives no time windows for the 2nd and 3rd quarter |
| Module 3 – standard tariff, 1st and 4th quarter 6 am–5 pm and 9 pm–midnight | 10.32 ct/kWh | |
| Module 3 – peak-load tariff, 1st and 4th quarter 5–9 pm | 16.02 ct/kWh |
The standing charge for consumption points up to 100,000 kWh is 108.59 € a year incl. VAT, the energy price 10.32 ct/kWh. According to the price sheet, the module 1 flat rate consists of 80 € incl. VAT for controllability and a stability bonus calculated from the energy price, 3,750 kWh and a factor of 0.2. It adds up: 80 € / 1.19 + 8.67 ct × 3,750 kWh × 0.2 gives the 132.26 € excl. VAT.
Three things stand out. At Syna, module 3 applies in winter, in the 1st and 4th quarter; at Netze ODR it is exactly the other way round, only from April to September. The low-load tariff is at night and amounts to roughly a tenth of the standard tariff; a heat pump or wallbox that runs between midnight and 6 am in winter benefits, while the peak-load tariff in the early evening costs about half as much again as the standard tariff. And the price sheet only says that the time windows must “be billed in at least two quarters of a year”; what applies in summer is not stated explicitly. If in doubt, Syna can clarify.
Which module pays off at which consumption is in the article Section 14a: module 1, 2 or 3?; the grid fee calculator works with your own figures.
Existing systems
For controllable consumption devices that already received a reduced grid fee under the old section 14a before 2024, price sheet 6c applies: energy price 2.84 ct/kWh incl. VAT without a standing charge, plus 21.72 € a year incl. VAT for metering point operation including the ripple control or tariff switching device. The requirements are a separate meter and the possibility for Syna to interrupt the system completely during the specified times.
At the operator's request, a switch to module 1 or 2 is possible. The general rules, including the deadlines, are in the article Section 14a EnWG for existing systems.
Syna, Netze ODR, Netze BW and NHF compared
| Syna | Netze ODR | Netze BW | NHF / NHL | |
|---|---|---|---|---|
| Interface | control cable to 230 V isolating relays; Cat 6 recommended | terminal strip and RJ-45 always | RJ-45 always, terminal strip for analogue control | customer-owned 230 V coupling relay |
| Three-point in existing cabinets | BKE-AZ adapter plate | two routes, without BKE-AZ | three routes, BKE-AZ one of them | four cases by meter location |
| Requirements | TAB, from January 2025; no separate TMA | TMA, August 2026 | TMA, April 2026 | TMA, December 2023 |
| Module 1, incl. VAT | 157.39 €/year | 132.39 €/year | 147.56 €/year | 152.83 €/year |
| Module 3 low tariff | midnight–6 am, 1st and 4th quarter only | 11 am–5 pm, April–September only | 10 am–2 pm, all year | midnight–6 am, all year |
The details on the other three: Section 14a EnWG at Netze ODR, Section 14a EnWG at Netze BW and Section 14a EnWG at NHF and NHL in Heilbronn.
Frequently asked questions
Does Syna have its own technical minimum requirements for section 14a?
Not as a separate document. Syna's low-voltage TAB, valid from 1 January 2025, take effect together with the BDEW federal model text as the technical minimum requirements under section 19 EnWG. What Syna requires for section 14a is in chapter 9 of this TAB.
What must be prepared in the meter cabinet for control at Syna?
A control cable from the device to the installation-side connection space, where isolating relays rated 230 volts and at least 6 amps go, together with a 6 A/10 kA circuit breaker. The relay wires and L3 are laid onto a terminal strip in the space for supplementary applications until the control box arrives. A network cable of at least Cat 6 onto a surge protector with an RJ-45 socket is recommended in addition.
What applies to module 3 at Syna?
According to the 2026 price sheet, the three tariff levels apply in the first and fourth quarter: low-load tariff from midnight to 6 am at 1.04 cents per kilowatt hour incl. VAT, standard tariff from 6 am to 5 pm and 9 pm to midnight at 10.32 cents, peak-load tariff from 5 to 9 pm at 16.02 cents. Module 3 can only be chosen together with module 1. The price sheet gives no time windows for the second and third quarter.
How large is the module 1 credit at Syna?
132.26 euros a year excl. VAT, 157.39 euros incl. VAT, according to the 2026 price sheet. It cannot push the grid fee of a consumption point below 0.00 euros. Anyone who chooses no module is billed under module 1 as the basic module.
Do I need an adapter plate in an old meter cabinet at Syna?
If a meter field with three-point mounting continues to be used when the customer installation is changed, yes. Syna's TAB then require a BKE-AZ adapter plate with a space for supplementary applications. According to the TAB, it is part of the customer installation.
Sources
All statements come from Syna GmbH's documents, each with the date it was checked. In case of deviations, the grid operator's documents in their current version apply. The source documents are in German; quotations are my translation.
- TAB Syna GmbH – technical connection conditions, low voltage (PDF) Valid from 01.01.2025; preamble (TMA under section 19 EnWG), chapters 4.1 and 4.2.3 (registration, commissioning), 7.4 (existing installations), 7.7 and 7.8.2 (space for supplementary applications, radio and antenna), 9 (controllable consumption devices, isolating relays, terminal strip, Cat 6, zRfZ, BKE-AZ), 10.6.4 and 10.6.7 (charging equipment). Checked on 28.10.2026.
- Price sheet Syna GmbH – electricity price sheets 2026 (PDF) Valid from 01.01.2026; price sheet 4 (standard grid fee), price sheets 6a to 6c (modules 1 to 3, module 3 tariff times, existing systems). Checked on 28.10.2026.