Section 14a · Devices
Does my device meet section 14a EnWG?
The three routes to the device, the minimum standard for the digital interface and how to recognise a reliable manufacturer statement.
Read the article →Technical article · Overview
Whether a device meets section 14a is not in the law but in the manufacturer's documents – if it publishes any. Each manufacturer here has a page of its own that reproduces exactly that: which route, which interface, which document date. This overview puts them side by side and records what stands out.
| Manufacturer | Route according to the manufacturer | EEBUS | Manufacturer source |
|---|---|---|---|
| Bosch and Buderus | EEBus via internet module (K 40 RF, MX400); also the SG1 contact, with throttling from control panel software NF47.12 and in the NF87 line, otherwise switch-off | yes, with unit list and software versions | interfaces pages, August 2026; UI 800 and BC400 control panel instructions up to 2026/10 |
| Daikin | utility contact, communication board, HomeHub with EEBUS | yes, via HomeHub; manufacturer page still says “planned” | leaflet 03/2025, HomeHub reference 2026.01 |
| Stiebel Eltron | utility contact (switch-off) or power limitation via ISG Connect from firmware 1.4.0; inputs on WPM, ISG, KNX or Modbus | not described in the instructions | ISG Connect instructions, April 2025 |
| Vaillant | utility contact, EEBUS, energy management system | yes, recommended; no unit list | guide pages vaillant.de |
| Viessmann | power limitation via contact 143.4, can be combined with utility lockout or Smart Grid | not described in the documents analysed | installation and service instructions Vitocal 250-A, 4/2025 |
| Weishaupt | power limitation via controller input or SG Ready 1.1 | not described in the instructions | Biblock installation instructions, 2026-09 |
| Manufacturer | Route according to the manufacturer | EEBUS | Manufacturer source |
|---|---|---|---|
| Easee | contact to metering solution and Equalizer | explicitly not supported | help article, 3 Sept 2026 |
| Fronius Wattpilot | digital input (Flex, Home 2.0); online requirement | not mentioned | operating instructions, August 2026 |
| go-e | potential-free input, Modbus TCP via PLC, contactor | not mentioned | conformity document V 1.41 |
| Heidelberg / Amperfied | Modbus via EMS, potential-free contact | not mentioned | Amperfied article, 16 March 2026 |
| KEBA | switch contact X1, Modbus TCP, OCPP | not mentioned | P40 installation manual V2.00 |
| SMA (charging solutions) | direct control, on the eCharger via DI 1–4 | via the Sunny Home Manager 2.0 | technical information V1.0, eCharger manual |
| Manufacturer | Route according to the manufacturer | EEBUS | Manufacturer source |
|---|---|---|---|
| GoodWe | DRM/RCR/EnWG port on the inverter | not mentioned | ET G2 manual V2.2, SolarGo V2.3 |
| Sigenergy | contact on DI5 of the Energy Controller | not mentioned | guide V1.0, March 2025 |
| SMA (Sunny Home Manager 2.0) | energy management, distributes the instruction | yes, LPC use case | technical information V1.0 |
For iDM and Panasonic I found no publicly available manufacturer document up to the date of checking that describes how their heat pumps implement control under section 14a.
Without a citable manufacturer source there is no manufacturer page here – until then, the procedure and written information from the manufacturer about the specific unit help. A renewed search on 8 October 2026 changed nothing.
Two more names come up in search queries. For Siemens it is unclear which product is meant. Anker SOLIX sells battery systems that are mostly below the threshold; when the Power Dock with a connected wallbox and several Solarbanks falls under section 14a is answered as a question in the article The 4.2 kW in section 14a EnWG.
Among the wallbox manufacturers analysed here, none names an EEBUS connection of the wallbox itself in its section 14a documents; Easee explicitly rules it out for its configuration. Control runs via contacts, Modbus or OCPP. SMA describes the route via the Sunny Home Manager 2.0, which receives the control box's EEBus instruction and distributes it to the devices.
Because up to the date of checking I found no publicly available document from these manufacturers describing how their heat pumps implement control under section 14a. iDM writes about section 14a only in general terms, Panasonic names an input for power control but makes no reference to section 14a. Without such a source, no manufacturer page is created here. As soon as there is one, the page will follow.
The manufacturer sources, with document date and check date, are on the individual manufacturer pages. Listed here are only the sources on the manufacturers without a page of their own, plus the Bundesnetzagentur's ruling and the subsidy directive.
This overview reproduces manufacturer information; it replaces neither the manufacturers' documentation nor the technical connection conditions of your grid operator. Haag Automation has no business relationship with any of the manufacturers named.
Planning a heat pump, wallbox or battery and want control and metering thought through together from the start? Write to me – the initial consultation is free.