Technical article · Overview

Section 14a by grid operator

The law is the same, and so are the Federal Network Agency's determinations. Yet what has to be prepared in the meter cabinet and what control saves each year is decided by the grid operator. This page compares the grid operators whose documents I have evaluated, and below that lists every electricity grid operator in Germany with its contact details.

Own page
Netze BW, NHF and NHL, Netze ODR, Syna – each from the grid operator's documents
Directory
all connection grid operators for electricity with a public grid, from the Marktstammdatenregister
Status
October 2026 · retrieval date above the directory
Author
Julian Haag, state-certified electrical engineering technician

What applies nationwide

Which devices fall under section 14a is set identically for all grid operators by the Federal Network Agency's determination BK6-22-300: heat pumps, non-public charging points, room cooling systems and battery storage above 4.2 kW. The three grid fee modules are in determination BK8-22/010-A; they apply to every distribution system operator, only the prices are set by each one. The basics are in the guide to section 14a EnWG and the article Module 1, 2 or 3?.

What each grid operator decides for itself

Among the four grid operators whose documents I have evaluated so far, exactly the points that matter for installation and the bill diverge:

Building to one grid operator's requirements may mean rework in another's area. That is why the responsible grid operator's documents belong before the material order.

The evaluated grid operators compared

Grid operators under section 14a, according to their own documents
Grid operatorInterfaceThree-point in existing cabinetsModule 1, incl. VATModule 3 low tariff
Netze BWRJ-45 always, terminal strip for analogue controlthree routes, BKE-AZ one of them147.56 €/year10 am–2 pm, all year
NHF / NHLcustomer-owned 230 V coupling relayfour cases by meter location152.83 €/yearmidnight–6 am, all year
Netze ODRterminal strip and RJ-45 alwaystwo routes, without BKE-AZ132.39 €/year11 am–5 pm, April–September only
Synacontrol cable to 230 V isolating relays; Cat 6 recommendedBKE-AZ adapter plate157.39 €/yearmidnight–6 am, 1st and 4th quarter only

More grid operators will follow as their documents are evaluated. A page of its own only comes when the grid operator publishes its requirements; for all others, the directory here shows where to ask.

Finding your grid operator

The responsible grid operator is named on your electricity bill. The electricity supplier is the wrong place to ask: it sells the electricity, while the grid and the requirements for the meter location belong to the grid operator. The registered office is of limited help, because many grid operators serve several municipalities, some across state borders.

With the name from the bill, you will find the grid operator in the directory below, sorted by the federal state of its registered office. Your browser's search (Ctrl+F) is usually quicker.

All electricity grid operators

The directory contains every connection grid operator for electricity registered as active in the Marktstammdatenregister. Not included are operators of closed distribution systems, for example in industrial parks, the four transmission system operators and Baltic Cable AB, because no households are connected to these grids. Each grid operator entered its e-mail, phone and website in the register itself; personal e-mail addresses of individual employees are not listed here.

824 grid operators, grouped by the federal state of their registered office (not of their grid area). Source: Marktstammdatenregister of the Federal Network Agency, retrieved 28 October 2026.

Baden-Württemberg (115)

Bavaria (227)

Berlin (3)

Brandenburg (30)

Bremen (4)

Hamburg (1)

Hesse (52)

Mecklenburg-Western Pomerania (19)

Lower Saxony (66)

North Rhine-Westphalia (106)

Rhineland-Palatinate (48)

Saarland (17)

Saxony (35)

Saxony-Anhalt (30)

Schleswig-Holstein (41)

Thuringia (29)

other (1)

Frequently asked questions

How do I find out which grid operator is responsible for my connection?

The grid operator is named on your electricity bill. Its registered office says little: many operate grids in several municipalities, some across state borders. The directory on this page is therefore sorted by name within the federal state where the grid operator has its registered office.

What does each grid operator decide for itself under section 14a?

The Federal Network Agency sets the modules and how they are calculated for all distribution system operators; each grid operator sets its own prices. On top come the technical requirements at the meter location: which interface to prepare, how the control box fits into an old meter cabinet and when module 3 applies. Among the grid operators with their own page, exactly these points differ clearly.

Where do the contact details in the directory come from?

From the Marktstammdatenregister of the Federal Network Agency. Each grid operator enters its public e-mail address, phone number and website there itself. The retrieval date is shown above the directory. Personal addresses of individual employees, which some grid operators have entered there, are not listed; website and phone remain.

Sources

The sources for the individual grid operators are on their pages, with document version and check date. The source documents are in German.

Haag Automation has no business relationship with any of the grid operators named. The respective grid operator's documents and information are binding.

You are planning a heat pump, wallbox or battery and need the single-line diagram for the registration with the grid operator? I can draw it for you – or write to me about control and energy management.