Grid connection · Basics
The single-line diagram for registering a PV system
What VDE-AR-N 4105 requires, what Netze BW says about it, and why there is no standard form.
Read the article →Technical article · Grid connection · Berlin
There is no standard form for the single-line diagram (Übersichtsschaltplan) of a PV system; what is required is content, and VDE-AR-N 4105 sets that first. Stromnetz Berlin goes a good deal further in its own documents: modules with number and power, the cables, the meter panel, the existing installation and a visible distinction between old and new. This page compiles the Berlin requirements and shows what a sample sheet still lacks for them.
The basic requirement is in the application form of VDE-AR-N 4105: a single-line diagram “from the grid connection”, including the metering concept. What that means in general is covered in The single-line diagram for registering a PV system. In its information sheet on registering generating units, Stromnetz Berlin puts it like this (translated):
“In the single-line diagram, all equipment, including grid and system protection, grid security management, where applicable the integration of the key switch for switching off the system under VDE-AR-N 4105 section 8.1 […], and its mode of operation, stating type, number and power, shall be shown single-line from the grid connection point. The grid connection point shall be named (street, house number, where applicable number of the customer's own transfer station).”
The checklist of required documents is more specific still. Its footnote on the single-line diagram lists what the drawing must show:
For marking cables and lines, the checklist names IEC 60617-2 with its standard graphical symbols; alphanumeric marking is accepted as an alternative.
The five sheets are the same as for every grid operator: one or two inverters, with or without battery, each also as a fillable version. They were derived from project drawings and stripped of all system and customer references.
One inverter, no storage
One module array with two strings, DC surge protection, smart meter and
bidirectional meter. The base case.
One inverter with storage
As above, plus a battery coupled on the DC side of the hybrid
inverter.
Two inverters, no storage
Two separate module arrays – two roof surfaces with different
orientations, say – each on its own inverter.
Two inverters, one battery
Two module arrays, with the battery attached to one of the two
inverters.
Two inverters, two batteries
The largest of the five: two module arrays and two batteries routed to
one inverter.
For Berlin, the samples are not enough as they are. The table shows which item of the checklist the sheet already contains and which your electrician still has to add:
| Item in the checklist | In the sample sheet |
|---|---|
| single-line from the grid connection, metering concept | yes, service connection box, bidirectional meter, smart meter |
| modules with designation, number and power per module | field for module power in the fillable version; add designation and number |
| inverter with type | field for the inverter type in the fillable version |
| choice of cables and lines | no, add |
| fuses, central grid protection and key switch where required | no, add; the samples are for systems up to 30 kVA |
| arrangement and type of the meter panel | no, add |
| grid connection point with street and house number | no, add |
| existing systems, new system marked in colour | no; the samples show a new system without existing units |
These are samples, not templates for submission. A single-line diagram describes one specific system, and by submitting it the electrical contractor confirms that it was built that way. Strings, cables and meter panel must match your own system.
Need the diagram for your own system in Berlin, with everything the checklist asks for? I draw it from your details – 50 € per diagram.
A Berlin speciality is in the information sheet under feed-in to the low-voltage grid: for a generating unit on a low-voltage service connection with a connected load above 30 kVA up to 100 kVA, a key switch to the grid operator's specification has to be provided in the safety line. Its design is described in a separate information sheet among Stromnetz Berlin's technical guidelines. Its integration belongs in the single-line diagram.
Above 30 kVA, VDE-AR-N 4105 already requires the location of the central grid and system protection and the design of the coupling switches in the diagram. From 135 kW, according to the information sheet, Berlin applies VDE-AR-N 4110 instead of VDE-AR-N 4105.
On grid security management, the information sheet says: type and design are agreed with the grid operator during planning. The result belongs in the diagram.
For systems below 135 kVA, the checklist names, besides the single-line diagram, forms E.1 to E.8 of VDE-AR-N 4105, a site plan with parcel numbers and the installation location, where required a certificate for power flow monitoring at the grid connection point, and for PV systems the inverter data sheet. According to the information sheet, only the forms provided by VDE FNN should be used.
The checklist carries version 11/2019 and was available on Stromnetz Berlin's website on the date of checking. Since spring 2026 there is a new edition of VDE-AR-N 4105 with a transition period; which edition the registration follows is for the electrician to clarify.
A single-line diagram from the grid connection point to the generating unit. According to the checklist it must contain: equipment data, the choice of cables and lines, protective devices, the arrangement and type of the meter panel, and the generating units. For PV systems, the modules have to be entered as well as the inverters, with designation, number and power per module. The grid connection point has to be named with street and house number.
Yes. According to Stromnetz Berlin's checklist, existing generating units and existing backup generators have to be drawn in, and the new parts have to be clearly marked, for example in colour. Anyone extending a system or retrofitting a battery therefore draws the whole customer installation, not just the new part.
According to Stromnetz Berlin's information sheet, when feeding into the low-voltage grid with a connected load above 30 kVA up to 100 kVA. The key switch sits in the safety line and is designed to the grid operator's specification. Its integration has to be shown in the single-line diagram.
The requirements in this article come from the following documents, each with the date it was checked. In the individual case, Stromnetz Berlin's technical connection conditions and requirements in their current version are binding.
This article replaces neither the application rule nor Stromnetz Berlin's requirements. Registering and connecting a generating unit is reserved for a registered electrical contractor. Haag Automation has no business relationship with Stromnetz Berlin.