What a heat plan says – and what it does not

When your municipality publishes its heat plan, it may well say that your house lies in an area considered suitable for a heat network. That sounds like a commitment. It is not.

Example
Municipal heat plan of Ilsfeld, Germany, under state climate law
Adopted
Municipal council, 15 October 2024
Figures as of
October 2026
Author
Julian Haag, state-certified electrical engineering technician

Updated on 8 October 2026: Since 29 July 2026 the German Building Energy Act has been called the Building Modernisation Act (Gebäudemodernisierungsgesetz). The 65-per-cent rule and the replacement obligation for old boilers have been deleted. This article now describes the new legal position.

The short version

A municipal heat plan is a strategic planning instrument, not a development plan and not a contract. It shows where a heat network would make sense, and it obliges nobody – neither the municipality to build one nor you to connect.

For homeowners that means two things. First: a suitable area is no reason to postpone replacing a boiler and wait for a network that may never arrive. Second: the heat plan does not prescribe anything for your boiler replacement. The Heat Planning Act states explicitly that it has no legal effect on third parties, and since 29 July 2026 the former link to the 65-per-cent rule no longer exists either.

What is in the plan

A heat plan goes through four steps, and the output of each is useful to you to a different degree.

The four steps of a municipal heat plan Inventory analysis, potential analysis, target scenario and measures follow one another. The inventory yields solid data, the potential analysis theoretical upper limits, the target scenario a model calculation and the measures concrete next steps. Towards the right, how binding the content is decreases; the value for an individual owner stays limited. 1 Inventory buildings, boilers, consumption, networks 2 Potential what would be theoretically possible 3 Target scenario a model calculation for a target year 4 Measures what is to be started within five years solid data assumptions and models statements of intent None of the four steps creates a right to a connection.
Own diagram following the structure of municipal heat plans.

The inventory is the most useful part. It rests on real data: consumption figures from network operators, extracts from chimney sweeps' records, 3D building models. In the example, 4,135 buildings were analysed. Figures like these are solid and do say something about your neighbourhood.

The potential analysis is a ceiling, not a plan. If it states that ground collectors across the municipality could deliver 900 GWh a year, that only means the amount would be technically conceivable if every suitable area were used. It says nothing about whether it works on your plot.

The target scenario is a model calculation. It distributes future demand across technologies – in the example, for 2040, roughly 28 per cent heat networks, 44 per cent decentralised heat pumps and 28 per cent biomass. The plan itself notes that this does not fix the technologies in any binding way.

The measures are the most concrete part – and they too are instructions to investigate. State law requires at least five measures whose implementation is to begin within five years. In practice, "begin" often means commissioning a feasibility study.

The most important sentence is usually in the small print

In the example plan it reads:

"In this heat plan, prepared according to the requirements of the state climate act, no binding expansion plans are adopted. The suitable areas presented […] serve as a strategic planning instrument for infrastructure development in the coming years."

And on how firm the boundaries are: for the suitable areas, "further individual investigations into economic viability and feasibility are strictly necessary"; the area-wide assessment can "only provide a rough, indicative estimate".

That is not a weakness of this particular plan but the nature of the instrument. A heat plan looks at city blocks and streets, not at individual houses.

Boiler replacement: what applies since 29 July 2026

Until the end of July 2026 this section described the 65-per-cent rule of the Building Energy Act, with deadlines that were tied to heat planning. That rule no longer exists. With the act of 23 July 2026, the Building Energy Act is now called the Building Modernisation Act (GModG). Sections 71 to 73, that is, the 65-per-cent requirement, its transitional deadlines and the operating ban for old boilers, have been deleted. This has been in force since 29 July 2026.

No heating obligation is attached to the heat plan any more. Even a formal area designation under section 26 of the Heat Planning Act obliges nobody to actually use a particular type of heat supply; that is what section 27(1) says, and the reference to the building energy law has been deleted from the Heat Planning Act.

When replacing a heating system, the owner chooses from the options in section 42 GModG, from a heat pump and a heat network connection to a gas or oil boiler. For a new heating system fired with gas, heating oil or LPG that is installed in an existing building after 29 July 2026, section 43 requires a rising share of the heat to come from biomethane, bio-oil, biogenic LPG or hydrogen:

Minimum share for new gas and oil boilers in existing buildings (section 43 GModG)
FromShare from biogenic fuels or hydrogen
1 January 202910 per cent
1 January 203015 per cent
1 January 203530 per cent
1 January 204060 per cent

The obligation can also be met with a solar thermal system or a ventilation system with heat recovery, for which the act sets fixed minimum values until the end of 2034, or with a heat pump hybrid whose heat pump is large enough. In addition, section 42a announces a separate act that the federal government is to present by 1 December 2026: a green gas and green heating oil quota obliging suppliers to place only climate-neutral fuels for buildings on the market from 2045.

For the decision this means: a new gas or oil boiler is allowed, but from 2029 a growing share of its fuel must come from biogenic sources or hydrogen. What that will cost cannot be foreseen today. Anyone replacing a boiler should include this staircase in the calculation over the lifetime of the system.

Mandatory connection – what is possible and what applies

A municipality may designate an area as a priority heat network area with mandatory connection and use. In that case:

The power to do so comes from state law; section 109 GModG clarifies that municipalities may also use it for climate and resource protection. Without such a statute there is no obligation to connect. But the reverse holds too: without an expansion decision there is no right to a connection either. A suitable area establishes neither.

In the Ilsfeld example no such statute exists. On the municipality's register of local statutes, the only instrument relating to heat supply is the operating statute of the municipal utility “Nahwärmeversorgung Ilsfeld”; there is no heat statute and no designation of network areas, even though the heat plan itself proposes exactly that as measure 9, to be started “by the end of 2025”.

What the plan reveals about your neighbourhood

The useful part is the inventory data. From the example plan:

The target scenario assumes a renovation rate of 2 per cent a year. The plan itself notes that the national average is 0.8 per cent. Anyone reading the model calculation should know that assumption – it is ambitious.

What you can actually do

A fairly clear course of action follows from the legal position:

The last point is where measurement genuinely helps: anyone who records flow and return temperatures, outdoor temperature and consumption over a heating season has a solid basis for every later decision – network connection, heat pump or renovation – instead of a guess.

Frequently asked questions

What does it mean if my house is in a designated suitable area?

That the heat plan considers the area fundamentally suitable for a heat network. It is not a commitment, not a right of connection and not an obligation. Whether anything is actually built is decided later, in feasibility studies and a separate resolution.

Does the 65-per-cent rule still apply to boiler replacement?

No. Since 29 July 2026 the Building Energy Act has been called the Building Modernisation Act, and the 65-per-cent requirement has been deleted. Anyone now installing a new gas or oil boiler in an existing building must instead use a rising share of biogenic fuels or hydrogen: 10 per cent from 2029, 15 per cent from 2030, 30 per cent from 2035 and 60 per cent from 2040. The heat plan itself triggers no obligation.

Can the municipality force me to connect to a heat network?

Only if it designates a priority heat network area with mandatory connection and use. New buildings must then connect immediately, existing buildings only when a fundamental change is made to the heat supply, which normally means replacing the heating system.

Should I postpone replacing my boiler until the heat network arrives?

Only if there is concrete expansion planning with a timeframe for your street. A suitable area in the heat plan is not a sufficient basis – the plan itself points out that further individual investigations are strictly necessary.

How often is a heat plan updated?

Under the federal Heat Planning Act it must be updated every five years. Part of that update is checking whether the adopted measures have been implemented.

Sources

The quoted passages and figures come from the published heat plan of the municipality of Ilsfeld and from the relevant legislation. The source documents are in German.

This article sets out the legal position in general terms and is not legal advice. Binding information about your property is provided by the municipality and the network operator; your heating system is assessed by the responsible chimney sweep.