KEBA has given section 14a a chapter of its own in the KeContact P40 installation manual, describing which interfaces control the wallbox and what to set on the switch contact. For the older P30 there is a statement on the required software version. Both are summarised here.
In the chapter on country-specific features for Germany, KEBA writes: “The charging station offers the following interfaces for control: switch contact inputs X1a/X1b, Modbus TCP, OCPP. With the appropriate configuration, the available charging current can thus be reduced in compliance.”
For the control box, the switch contact is the obvious route. The manual describes the principle like this: “When the switching signal is active, the charging power of the charging station is limited. When the grid operator removes the switching signal for limiting the charging power, the charging power is slowly increased again over a certain period.” It is set up in the KEBA eMobility app:
| Parameter | Setting |
|---|---|
| X1x switch contact input activated | ON |
| X1x switch contact input function | max. charging / reduced charging |
| X1x switch contact input current limit | setpoint in amperes for reduced charging |
The inputs are intended for an external potential-free contact. They have no electrical isolation from the internal electronics; to read the state, the contact is loaded with 12 V DC PELV and 2.5 mA. For a control box's relay contact that is no problem; for wiring via external voltage it is.
Elsewhere in the manual KEBA writes: “Electric vehicles generally require a minimum charging current of 6 A per phase” – which gives 4.14 kW on a three-phase connection. A setpoint of 6 A three-phase is therefore just below the 4.2 kW the grid operator must at least allow under direct control (clause 4.5.1 of the ruling), while keeping the car charging. A higher value is permitted as long as it complies with the grid operator's instruction.
The P40 can lift an intelligent charging current limit via the touch button “once for the current charging session, provided the grid operator permits this”. For a limit under section 14a that is not the case: the ruling gives the grid operator's instruction priority over other control requests (clause 4.6). Whoever connects the wallbox to the control box checks that the section 14a limit cannot be bypassed this way.
For the KeContact P30, KEBA wrote in May 2024: “From the next software version 1.18, the available charging current on the KeContact P30 can be reduced to 0 A or 6 A in compliance with the EnWG when the enable contact X1 is opened or closed, if the DIP switches are configured accordingly. Up to and including software version 1.17.1 this was defined as 8 A.”
So a P30 still running an older version reduces to 8 A instead of 6 A via X1. Check the software version before registration and record it in the commissioning report. The statement dates from 2024; what counts is the current P30 manual.
For section 14a, KEBA names the switch contacts, Modbus TCP and OCPP, but not EEBUS. If the metering point operator's control box only controls digitally via EEBUS, an energy management system is needed in between that understands EEBUS and drives the wallbox via one of its interfaces. Which control the responsible grid operator provides for is set out in its technical connection conditions.
According to the installation manual (version 2.00), the P40 offers the switch contact inputs X1a and X1b, Modbus TCP and OCPP for control under section 14a; with the appropriate configuration, the available charging current can be reduced in compliance. For this, the function max. charging / reduced charging with a setpoint in amperes is set on the switch contact input.
In May 2024 KEBA wrote that from software 1.18 the P30 can reduce the charging current to 0 A or 6 A via the enable contact X1 if the DIP switches are configured accordingly; up to version 1.17.1 it was 8 A. The software should therefore be at least on version 1.18.
The touch button can lift an intelligent charging current limit once for the current charging session – but according to KEBA only if the grid operator permits it. For a limit under section 14a, the ruling gives the grid operator's instruction priority over other control requests.
The manufacturer information comes exclusively from the manufacturer's own documents, each with its date and the date it was checked. Manufacturer documents change with every firmware release; what counts is the version valid at the time of installation. Quotations from German documents are our translation.
This article reproduces manufacturer information; it replaces neither KEBA's documentation nor the technical connection conditions of your grid operator. Connection and registration are reserved for a registered electrical contractor. Haag Automation has no business relationship with KEBA.
Planning a wallbox and want section 14a, solar surplus and load management solved in one go? Write to me – the initial consultation is free.