Technical article · Manufacturers

GoodWe and section 14a EnWG

With a hybrid inverter the mix-up is easy: it has a port for the ripple control receiver, and section 14a has something to do with the grid operator. GoodWe really does put both on the same port. This page shows what GoodWe writes about it, where section 14a applies to a battery at all and what to set in the app.

Devices
ET series G2 hybrid inverters: GW6000-ET-20, GW8000-ET-20, GW10K-ET-20, GW12K-ET-20, GW15K-ET-20
Port
DRM/RCR/EnWG – for the DRED, RCR or EnWG 14a function
Setting
SolarGo app: RCR mode and percentage for the DI port
Manufacturer sources
ET G2 user manual (V2.2, 30 September 2026), SolarGo user manual (V2.3, 10 July 2025)
Status
October 2026 · primary sources below, with the date each was checked
Author
Julian Haag, state-certified electrical engineering technician

Where section 14a applies to a battery

The Bundesnetzagentur's ruling covers storage only “with regard to electricity withdrawal (charging)” and only with a grid connection capacity above 4.2 kW (clause 2.4.1). What is controlled is how much the battery charges from the grid. Feed-in to the grid is not part of section 14a; its control is governed by the EEG, and grid operators use ripple control receivers for that too – Netze BW, for example, for PV systems from 25 to under 100 kW.

The port

The ET series user manual describes a communication port “DRM/RCR/EnWG” as the “connection for the DRED, RCR or EnWG 14a function” and explains the three functions:

A note from the same section that saves trouble at commissioning: “If the inverter uses the RCR or DRED function, make sure that the remote shutdown device is connected or the remote shutdown port is short-circuited.” According to the manual, the remote shutdown input must be a normally closed contact.

GoodWe: which direction section 14a concerns The grid on the left, the GoodWe ET G2 hybrid inverter with battery on the right. A bold arrow from grid to battery stands for consumption, which section 14a limits, for batteries above 4.2 kilowatts. A dashed arrow back to the grid stands for feed-in, governed by the EEG, not section 14a. Below: both run over the same DRM/RCR/EnWG port, so the RCR mode must be chosen correctly in the SolarGo app. Grid GoodWe hybrid inverter ET G2 with battery section 14a: consumption / charging battery above 4.2 kW (item 2.4.1) feed-in: EEG, not section 14a One port for both: “DRM/RCR/EnWG” SolarGo › Settings › Advanced Settings› DRED/Remote Shutdown/RCR: choose the RCR modefor the device, set the DI port percentage
Because a ripple control receiver and a control box can share the same port, the app setting decides whether the contact controls consumption or feed-in. Check at the meter, as described above.

Setting it up in the SolarGo app

The SolarGo app manual describes the setting under “Settings > Advanced settings > DRED/Remote Shutdown/RCR”. For section 14a: “For areas where the EnWG 14a regulation applies, when activating the RCR function the RCR mode must be selected according to the type of device actually connected and the DI port power percentage must be set.”

This is where it is decided whether the control box contact limits grid consumption or is read as feed-in control. The quoted sections do not say what the percentage refers to. So after setting it, switch the real contact once and check at the meter whether grid consumption drops – and record the result in the commissioning report.

The GoodWe charger

For GoodWe's own charger, the SolarGo manual names an EnWG 14a function: it must be activated “according to the grid code requirements in certain countries or regions” to “ensure that the grid consumption of a single device does not exceed 4.2 kW”; the consumption current limit is to be set according to the actual requirements.

And EEBUS?

In both manuals the section 14a route is the contact input on the inverter. If the metering point operator's control box only controls digitally, an energy management system is needed in between. Which control the responsible grid operator provides for is set out in its technical connection conditions.

Frequently asked questions

How do I connect a GoodWe ET series inverter for section 14a?

At the DRM/RCR/EnWG communication port, which GoodWe describes as the connection for the DRED, RCR or EnWG 14a function. In the SolarGo app the function is activated under Settings, Advanced settings, DRED/Remote Shutdown/RCR; for section 14a, the RCR mode matching the connected device and the percentage for the DI port must be set.

Does my battery fall under section 14a?

Under the Bundesnetzagentur's ruling, batteries fall under section 14a only with regard to withdrawal from the grid, i.e. charging – and only with a grid connection capacity above 4.2 kW. Section 14a does not govern feed-in to the grid.

Is the RCR port for section 14a or for PV feed-in?

With GoodWe, for both: according to the manual the same port serves the DRED, RCR and EnWG 14a functions. Grid operators also use ripple control receivers for feed-in control of PV systems – Netze BW, for example, for systems from 25 to under 100 kW. Which function is meant is decided by the setting in the app.

Sources

The manufacturer information comes exclusively from the manufacturer's own documents, each with its date and the date it was checked. Manufacturer documents change with every firmware release; what counts is the version valid at the time of installation. Quotations from German documents are our translation.

This article reproduces manufacturer information; it replaces neither GoodWe's documentation nor the technical connection conditions of your grid operator. Connection and registration are reserved for a registered electrical contractor. Haag Automation has no business relationship with GoodWe.