Technical article · Manufacturers

go-e Charger and section 14a EnWG

go-e is one of the manufacturers that document section 14a the way you would wish: a dedicated document that names the affected models, distinguishes variants with and without a potential-free input and describes the connection route. This page summarises it and works out what the charging currents to set mean.

Models
Gemini 11/22 kW, Gemini 2.0 11/22 kW, Gemini flex and flex 2.0 11/22 kW, PRO CABLE and PRO CABLE ME (11 kW), CORE
Routes
potential-free input · Modbus TCP via PLC · contactor
Manufacturer source
go-e, “§ 14a EnWG Konformität”, version 1.41
EEBUS
not mentioned in the document
Status
October 2026 · primary sources below, with the date each was checked
Author
Julian Haag, state-certified electrical engineering technician

The three options

go-e opens with a clear statement: “All variants of the go-e Charger Gemini, Gemini 2.0, PRO and CORE series listed below can be operated and installed in compliance with section 14a EnWG”. For the Gemini, Gemini 2.0, PRO and CORE the document names three routes, for the Gemini flex and Gemini flex 2.0 two.

Connection routes according to go-e's conformity document, version 1.41
RouteGemini, Gemini 2.0, PRO, COREGemini flex, flex 2.0During curtailment
1 · Potential-free inputyesno, no potential-free inputcharging current limited to the set value
2 · Modbus TCP via PLCyesyescharging current limited to the transmitted value
3 · Contactoryesyeswallbox without power

Route 1: potential-free input

On the Gemini and Gemini 2.0, the potential-free output of the control box or ripple control receiver is connected to the white and red signal wires – “polarity does not matter” – and on the PRO and CORE to the digital input. In the app, a current limit of 6 A three-phase or 16 A single-phase is set under “Settings / Security / Digital input” and protected against changes with a technician password.

Route 2: Modbus TCP via a PLC

For the Gemini flex, which lacks the potential-free input, “control via the network makes sense”. A PLC – go-e gives the Siemens LOGO! 230RCE or 24RCE as examples – reads the control box output and writes the value via Modbus TCP (port 502) to holding register 211. For this, the charger gets a static IP address and the AMPERE_MAX setting is locked with the technician password.

Route 3: contactor

A contactor on the control box output disconnects the charger's power supply. According to go-e nothing is lost: settings and any RFID authentication are retained. go-e names the drawback itself: “no reduction of the charging current”, “only a complete switch-off”.

go-e: control via Modbus TCP with a PLC A chain from top to bottom: the control box output, a PLC such as the Siemens LOGO! 230RCE or 24RCE reads the contact and writes via Modbus TCP on port 502 to holding register 211 of the go-e Charger with a static IP address. The AMPERE_MAX setting is locked with the technician password. This is route 2, intended for the Gemini flex without a potential-free input. control box control output PLC, e.g. Siemens LOGO! 230RCE / 24RCE go-e Charger static IP address reads the contact Modbus TCP port 502 holding register 211 AMPERE_MAX locked with the technician password Route 2, for the Gemini flex which lacks a potential-freeinput; also for other models
Based on go-e’s document “§ 14a EnWG Konformität”, version 1.41. Register and port come from that document; go-e does not describe the PLC program itself.

What 6 A and 16 A mean

The Bundesnetzagentur's ruling requires the grid operator to leave at least 4.2 kW under direct control (clause 4.5.1). go-e's values are just below that: 6 A three-phase at 230 V works out at 3 × 230 V × 6 A ≈ 4.1 kW, 16 A single-phase at 230 V × 16 A ≈ 3.7 kW.

So during curtailment the wallbox gives way slightly more than it has to. That costs a little charging speed but breaks no rule: the 4.2 kW is what the grid operator must at least allow, not an obligation to use it all.

And EEBUS?

The conformity document names no EEBUS route. For section 14a that is no obstacle as long as the grid operator allows analogue control via contacts. Requirements differ from operator to operator; some make EEBus the minimum standard for the digital interface and require the terminal strip for analogue control in addition. The comparison of two operators is in the section 14a EnWG guide.

Frequently asked questions

Is the go-e Charger section 14a compliant?

According to go-e's conformity document (version 1.41), the Gemini, Gemini 2.0, Gemini flex, Gemini flex 2.0, PRO CABLE, PRO CABLE ME and CORE can be operated and installed in compliance – via the potential-free input, via Modbus TCP with a PLC or via a contactor. The Gemini flex and Gemini flex 2.0 lack the first route because they have no potential-free input.

Which charging current do I set on the go-e for section 14a?

go-e names 6 A three-phase or 16 A single-phase. At 230 V that works out at roughly 4.1 kW and 3.7 kW – slightly less than the 4.2 kW the grid operator must at least allow under direct control.

Is a contactor in front of the go-e Charger enough?

For section 14a, yes – go-e names the contactor circuit as the third option. go-e itself names the drawback: there is no reduction of the charging current, only a complete switch-off.

Sources

The manufacturer information comes exclusively from the manufacturer's own documents, each with its date and the date it was checked. Manufacturer documents change with every firmware release; what counts is the version valid at the time of installation. Quotations from German documents are our translation.

This article reproduces manufacturer information; it replaces neither go-e's documentation nor the technical connection conditions of your grid operator. Connection and registration are reserved for a registered electrical contractor. Haag Automation has no business relationship with go-e.