Read the article →Technical article · Photovoltaics · EEG 2027
The German government wants to abolish the fixed feed-in tariff (Einspeisevergütung) for new PV installations. Instead of 7.70 cents for 20 years, from 2027 there would be 5.2 cents for three years, and no fixed tariff after that. Anything commissioned by 31 December 2026 keeps the old terms. This page shows what the bill actually says, what is still open, and what it means for a system you are planning now – with the wording of the sources.
The official title is Entwurf eines Gesetzes für einen planbaren, kosteneffizienten, netzverträglichen und marktorientierten Ausbau der erneuerbaren Energien im Stromsektor (a bill for a plannable, cost-efficient, grid-compatible and market-oriented expansion of renewables in the power sector), Bundestag printed paper 21/7867 of 7 September 2026. The summary states the goal plainly:
“To this end, the fixed feed-in tariff for new installations will be consistently abolished. This goes hand in hand with a comprehensive obligation for new installations to use direct marketing.”
And on small rooftop systems:
“Support for new installations with less than 25 kilowatts of installed capacity will largely be discontinued.”
| Date | Step |
|---|---|
| 07.09.2026 | Government bill published as printed paper 21/7867 |
| 24.09.2026 | First reading in the Bundestag, referral to the Committee on Economic Affairs and Energy |
| 05.10.2026 | Public hearing in committee |
| open | Second and third reading, Bundesrat |
| 01.01.2027 | Intended entry into force (Article 7 of the bill) |
The same hearing also covers counter-proposals: a motion by the Greens, one by the Left Party calling for no cuts, and a bill by the AfD to abolish the EEG altogether. How the final text will look is therefore open. This page describes the bill as it stands and will be updated as soon as anything changes.
A side note from the Federal Network Agency shows why time matters: the current tariff rates are based on the EEG 2023, “which is applicable until 31 December 2026. A successor regulation for the period after 31 December 2026 is currently under parliamentary deliberation.” The end of the year is a boundary either way, not only in the bill.
If your system is commissioned this year, you get the rates the Federal Network Agency has published for commissioning from 1 August to 31 December 2026 – for 20 years, extended to the end of the twentieth calendar year.
| Share of capacity | Surplus export | Full export |
|---|---|---|
| up to 10 kW | 7.70 ct/kWh | 12.22 ct/kWh |
| over 10 to 40 kW | 6.66 ct/kWh | 10.24 ct/kWh |
| over 40 to 100 kW | 5.44 ct/kWh | 10.24 ct/kWh |
For a 15 kW system, the first rate applies to the first 10 kW and the second to the rest; the grid operator calculates a blended rate. Most rooftop systems run on surplus export: the house uses the power first, only the remainder goes to the grid. What a rooftop system produces per year at its location, and what that saves on the power bill, is worked out by the solar panel output calculator on xmoo.app.
This decides whether a system still falls under the old rules in December. Section 3 no. 30 EEG defines commissioning as
“the first operation of the installation exclusively with renewable energy […] after it has been made technically ready for operation; technical readiness requires that the installation has been permanently installed at the location intended for permanent operation and permanently fitted with the equipment necessary to generate alternating current”.
In plain terms: modules fixed on the roof, inverter permanently mounted and connected, and the system has produced power for the first time. Modules sitting on a pallet in the yard in December do not count. Neither does an inverter that is only delivered in January.
Check with your grid operator beforehand how they want the date documented, and get a dated commissioning report from your electrician. The system must also be registered within one month in the Federal Network Agency's market master data register (Marktstammdatenregister). If you are only now collecting quotes, get the commissioning date confirmed in writing.
The bill replaces the feed-in tariff with three ways of disposing of exported power. Which one is available depends on size and year of commissioning.
It is what remains of the feed-in tariff and, according to the explanatory memorandum, works “along the lines of the previous feed-in tariff”: the grid operator takes the power and pays a fixed rate. The rate is derived from the new uniform reference value of 6.2 cents, from which, under section 53 of the bill, “1 cent per kilowatt-hour is to be deducted” – i.e. 5.2 ct/kWh. From 1 August 2027 the reference value for newly commissioned systems falls by 1 percent every six months.
It is paid “until the 36th calendar month following commissioning”. The Bundestag sums it up itself: instead of 20 years as before, support is to run for only three years.
| Commissioned | Installed capacity |
|---|---|
| in 2027 | below 50 kW |
| in 2028 | below 25 kW |
| in 2029 and 2030 | below 7 kW |
| from 2031 | no transitional payment |
The Federal Network Agency may extend this phase until the end of 2032 at the latest if direct marketing for small installations cannot be handled with reasonable effort by then. Balcony solar units are excluded (up to 2 kW module and 800 VA inverter capacity): the bill provides no transitional payment for them, because the billing effort would exceed the value of the few kilowatt-hours they export.
After the three years – or from the start – the operator can sell the power on the exchange via a direct marketer. For installations below 25 kW, section 50c of the bill adds a bonus of 1.5 cents per kilowatt-hour exported, for at most 48 months. It is meant to cover the costs of entering direct marketing. On top comes whatever the marketer earns on the market, minus their fee.
What direct marketers will charge for a 10 kW system nobody knows today: there is hardly a market for it yet, which is exactly why the legislator builds in the transition period. No serious figure can be given here yet.
If you do not want to deal with marketing, installations below 100 kW can hand their power to the grid operator free of charge. Or they do not export at all: the bill explicitly reduces “hurdles for so-called zero-export installations”, i.e. systems that store or curtail their surplus. Several technical requirements of section 9 are to be waived for them; they must still be registered in the market master data register.
For exported power from new installations below 25 kW that is not directly marketed, the limit of 60 percent of installed capacity at the grid connection also remains in place until a smart meter with a control unit is installed – the same rule that the solar peak law introduced in 2025.
Suppose your system exports 1,000 kWh a year – a realistic order of magnitude for a small rooftop system with high self-consumption, and considerably more for many. The amounts scale linearly; insert your own figure.
| Commissioned 2026 | Commissioned 2027 (bill) | |
|---|---|---|
| Rate | 7.70 ct/kWh | 5.2 ct/kWh |
| per year | €77 | €52 |
| Duration | 20 years | 3 years |
| Total, nominal | €1,540 | €156 |
| afterwards | – | 1.5 ct bonus + market revenue, or €0 |
Over the full term that is a factor of ten. It sounds dramatic, but it looks different once you put self-consumption next to it: every kilowatt-hour you use yourself saves the energy price of your electricity tariff – it is on your bill. At an energy price of 30 cents, a self-consumed kilowatt-hour is worth almost four times as much as one exported in 2026, and almost six times as much as one exported in 2027.
The government justifies the abolition with exactly that argument: small systems are “often already economical without additional support due to lower costs, provided they can achieve high self-consumption shares”. The word that matters is provided. Anyone building in 2027 or later designs the system around self-consumption – or it does not pay off.
The honest answer: the feed-in tariff alone is rarely the reason. But three situations argue for bringing forward a system you were planning anyway:
What argues against it is a hasty order with the first provider available because December is looming. A badly planned system costs more over 20 years than the difference between 7.70 and 5.2 cents.
When exporting earns next to nothing, control becomes more important than the panels: when does the battery charge, when the car, when does the immersion heater run? This can be solved with local energy management, without a cloud and without new hardware for every task. My own PV runs with a Victron system and a Pylontech battery; the following articles show how the individual loads follow the surplus:
No. As of 30 September 2026 there is a government bill (printed paper 21/7867). The Bundestag held its first reading on 24 September and referred it to the Committee on Economic Affairs and Energy; the public hearing is scheduled for 5 October 2026. Nothing has been passed yet, and the bill may change during the process. It is intended to enter into force on 1 January 2027.
No. Under the transitional provision in the bill, installations commissioned before 1 January 2027 remain subject to the EEG as it stood on 31 December 2026. The tariff therefore continues on the terms under which the system was built, as a rule for 20 years from commissioning.
Under the bill, a time-limited transitional payment: the uniform reference value of 6.2 cents minus 1 cent, i.e. 5.2 cents per kilowatt-hour fed in, for at most 36 months. In 2027 it is open to installations below 50 kW, in 2028 only below 25 kW, and in 2029 and 2030 below 7 kW. Balcony solar units are excluded. After that, the options are direct marketing, handing the power to the grid free of charge, or zero export.
The EEG defines commissioning as the first operation of the installation after it has been made technically ready for operation. The installation must be permanently mounted at its intended location together with the equipment needed to generate alternating current, i.e. the inverter. Modules stored in the basement or a missing inverter are not enough. Check with your grid operator beforehand how the date has to be documented.
That depends almost entirely on self-consumption. Every kilowatt-hour you use yourself saves the energy price of your electricity tariff; every kilowatt-hour fed in earns at most 5.2 cents from 2027, and only for three years. The government justifies the step explicitly by saying that small systems with high self-consumption are economical without support. Battery, wallbox, heat pump or immersion heater therefore decide the calculation.
All information comes from the following documents, each with the date it was checked. The printed paper is a preliminary version and reflects a bill; only the promulgated law will be binding. All sources are in German.
This article describes a bill and is not legal or tax advice. Registering and connecting a PV system is reserved for a registered electrical contractor.