Home Assistant · Photovoltaics
Fronius in Home Assistant
Enable the Solar API on the Gen24, get the battery into the energy dashboard, set limits via Modbus TCP.
Read the article →Technical article · Manufacturers
Fronius describes section 14a in the operating instructions of the Wattpilot models: control runs via a digital input that not every model has. And there is a requirement you would not expect on a wallbox: in Germany the Wattpilot must be permanently connected to the internet.
Wattpilot Flex. “The Fronius Wattpilot Flex is equipped with a digital input (DI_1). The digital input in the mains supply line can limit the charging current.” Among the use cases, Fronius explicitly names connection to a ripple control receiver and “use of the Wattpilot Flex as a controllable consumer under section 14a EnWG”. Configuration is done in the Solar.wattpilot app: activating the digital input and configuring the switch contacts.
The Flex instructions set a condition that matters for wiring: if the insulation requirements are not observed, the Wattpilot and connected components can be damaged. “Only use permanently installed switching devices of overvoltage category 3 (according to EN IEC 60664-1).” The technical data list two non-isolated inputs.
Wattpilot Home 2.0. “The digital input can be used with the Fronius Wattpilot Home 2.0.” It limits the charging current, for example “for the grid operator to connect a ripple control receiver”. The contact logic is selectable: as normally open (NO), the red and white wires must be connected for the limit to apply; as normally closed (NC), they must not be connected for it. The settings can be protected with the technician password.
Wattpilot Go 2.0. The instructions for the 2.0 models name the digital input only for the Home 2.0. For the Go 2.0 they describe no connection to a control box.
Which charging current remains during curtailment is part of the input's configuration. Under direct control the grid operator must leave at least 4.2 kW (clause 4.5.1 of the ruling); the wallbox may take less, not more.
Both instructions contain the same sentence: “In Germany, the Wattpilot must be permanently connected to the internet to fulfil the documentation obligation under section 14a EnWG, so that implementation of external control commands can be proven.”
The obligation behind it is in the Bundesnetzagentur's ruling: the operator must ensure that implementation of a requested reduction “can be traceably demonstrated to the grid operator in each individual case” (clause 7.2). The information must be “kept for at least 2 years after the measure” (clause 7.3) and presented to the grid operator if there are justified doubts (clause 7.4).
In practice: with the Wattpilot, the Wi-Fi in the garage is part of the section 14a installation. If it drops out, the proof Fronius keeps via the connection has a gap. Anyone running an energy management system or Home Assistant anyway can log the interventions themselves as well.
EEBUS does not appear in either Wattpilot manual; the route described is the contact on the digital input. If the metering point operator's control box only controls digitally via EEBUS, an energy management system is needed in between. Which control the responsible grid operator provides for is set out in its technical connection conditions.
Via the digital input: the contact of the control box or ripple control receiver is connected to the input, which limits the charging current. Fronius describes this for the Wattpilot Flex and the Wattpilot Home 2.0; the input is configured in the Solar.wattpilot app.
The operating instructions for the 2.0 models name the digital input only for the Wattpilot Home 2.0. For the Go 2.0 they describe no connection to a control box.
Fronius writes that in Germany the Wattpilot must be permanently connected to the internet to fulfil the documentation obligation under section 14a EnWG, so that implementation of external control commands can be proven. The Bundesnetzagentur's ruling obliges the operator to be able to show traceably how a reduction was implemented and to keep this information for at least two years.
The manufacturer information comes exclusively from the manufacturer's own documents, each with its date and the date it was checked. Manufacturer documents change with every firmware release; what counts is the version valid at the time of installation. Quotations from German documents are our translation.
This article reproduces manufacturer information; it replaces neither Fronius's documentation nor the technical connection conditions of your grid operator. Connection and registration are reserved for a registered electrical contractor. Haag Automation has no business relationship with Fronius.
Planning a wallbox and want section 14a, solar surplus and load management solved in one go? Write to me – the initial consultation is free.