Metering · Battery
Solar self-sufficiency: check it against the meter
Why a self-sufficiency figure can look too good, and how a check against the meter shows it.
Read article →Technical article · Energy management
Without measurement, energy control is guesswork. Getting started costs less than most people assume – but it regularly fails on two things nobody mentions beforehand: room in the board, and whether the numbers are right afterwards.
From this article on Amazon (Germany):
three-phase DIN-rail energy meter* ·
split-core current transformers* ·
terminal blocks and markers*
Marked *: affiliate links. As an Amazon Associate I earn from qualifying purchases.
The first decision is not about hardware but about the question the measurement should answer. Three levels are common, and they differ enormously in how much room they consume.
The honest order is: the house connection first, then the large loads, then – if at all – individual circuits. Most wasted money in this area comes from starting at the other end.
With direct measurement, the measured current flows through the meter itself. Simple and accurate, but it caps the current at whatever the device's terminals can take – on DIN-rail devices, typically the range of a single final circuit.
With current transformers, the conductor stays where it is and a transformer clamps around it, feeding a proportional signal to the meter. This is the route for the house connection, because the currents there exceed what any DIN-rail device handles directly, and because the main conductors do not have to be cut.
A common three-phase DIN-rail meter measures up to 120 A per phase through transformers, occupies a single module (19 mm) and is accurate to ±1 per cent between 2 and 120 A. Below 2 A it degrades noticeably – ±2 per cent from 1 to 2 A, ±5 per cent below that. Irrelevant at the house connection, and precisely why a standby measurement taken this way does not match reality.
Search on Amazon.de: three-phase DIN-rail energy meter* · split-core current transformers*
The most common reason a planned measurement never gets built is not cost but space. The unit of account is the 18 mm module, and the sum rarely works out if you first do it on installation day.
What has to fit: the meter itself, the protective device for its supply, room for the transformers on the main conductors – which sit in the connection compartment, not on the rail – and terminal blocks for the transformer leads. On top of that comes whatever the meter cabinet must keep free for the grid and metering operators. The German connection rules (VDE-AR-N 4100) provide a dedicated space in the meter field for additional equipment, where the metering operator's devices – the smart meter gateway and its control unit – are housed. That space is not yours, however invitingly empty it looks.
Search on Amazon.de: terminal blocks and markers*
The sequence is the same in every build, and every step of it belongs to a qualified electrician: isolate the installation and secure it against re-energising, verify it is dead, clamp the transformers around the line conductors – the right way round, or the measurement will later show export where there is import – land the transformer leads, tap and protect the meter's supply, then test and return the installation to service.
This is not a DIY project. Parts of a meter cabinet remain live even with the main switch off. Working there presupposes the training, the instruments and the testing obligations of a qualified electrician. This section describes the result; it does not replace them.
Two points the schematic cannot show, and which go wrong most often in practice. First, the orientation of the transformers: it is marked on the device and determines the sign of the measurement – fitted the wrong way round, the installation reports export where there is import. Second, matching current and voltage to the same phase: the transformer on L1 must feed the input whose voltage terminal is also on L1. With two phases swapped the totals still add up – only the per-phase values do not, and that surfaces first at the reconciliation step.
Integration into Home Assistant is the easy part: a device with a local interface reports its values and the energy dashboard consumes them. Prefer a local connection over network and MQTT to a detour through a vendor cloud – for the same reason as anywhere else: what runs locally keeps running when the vendor changes the interface.
The step almost everyone omits is the important one: reconciliation against the utility meter. Note the reading, wait a defined period, read again, and compare with the sum from your own measurement. Without it, every later calculation rests on sand – and a transformer mounted the wrong way round, or a phase reference swapped, shows up no other way.
If the cabinet has no space, or the installation should not be touched at all, the meter itself remains. Modern metering devices carry an optical interface that emits data telegrams periodically; a reading head is held in front of it magnetically and listens in.
The upsides: no intervention in the installation, no electrician required, mounted in minutes. The limits: you get only what the meter emits – as a rule import and export at the house connection, not the breakdown behind it. Individual loads still need meters in the board. And on some devices the full data set has to be unlocked with a PIN from the metering operator first.
Ready-made reading heads are hard to come by through the usual channels – this is a case for a purpose-built head with a matching bracket rather than an off-the-shelf order.
Device data and rules this article relies on, each with the date it was checked. For your own build, what counts is the documentation of the device you choose and the connection conditions of your grid operator.
This article replaces neither the manufacturer's documentation nor your grid operator's connection conditions. Work inside a meter cabinet is reserved for qualified electricians.
Links marked with an asterisk are affiliate links. As an Amazon Associate I earn from qualifying purchases; the price is unchanged for you. What I recommend does not depend on it.
Opening the board anyway and want the metering built properly – from the transformer through to the energy dashboard in Home Assistant? Write to me – the first conversation is free.