Regulation · Grid operation
Section 14a EnWG in practice
What controllable consumption devices mean for heat pumps and wallboxes – and where an energy management system is the better choice.
Read the article →Technical article
The municipal heat network in Ilsfeld turns wastewater of around 10 °C into a network flow of 80 °C. The interesting part is not the heat pump on its own, but how it works together with the combined heat and power units: in series, not in parallel.
At the outlet of the treatment plant there is water available at around 10 °C on annual average – warmer than outdoor air in winter, cooler in summer, and above all available all year round. Two heat pumps raise this level to 60 to 65 °C. Only then do the combined heat and power units at the same site lift the temperature to the 75 to 80 °C the network requires.
This series arrangement is the core of the concept. It means the heat pumps never have to work against the full network flow temperature – and their efficiency depends on precisely that.
Heat pumps live off the temperature lift: the difference between source and useful temperature. The smaller that lift, the more heat one kilowatt-hour of electricity delivers. The common air-source heat pump has a fundamental problem here – its source is coldest exactly when demand is highest.
Treated wastewater behaves differently. It comes from heated buildings, from showers, washing machines and sinks, and therefore holds a remarkably stable level of around 10 °C throughout the year. The second advantage: it flows anyway. Unlike ground loops, nobody has to drill; unlike river water, there is no low-water period.
In Ilsfeld, two variable-speed submersible pumps of 45 m³/h each move the treated water from the outlet channel to the heat exchangers. The water cools by 4 to 5 K in the process and then flows into the river Schozach. This has no effect on the plant's biology, because extraction takes place downstream of secondary clarification.
The decisive point: heat pump and CHP unit do not work side by side on the same task, but one after the other on temperature stages that build on each other.
The difference is larger than it looks. If the heat pumps had to reach 80 °C on their own, the temperature lift would be 70 K. In the cascade it is around 50 K – and the final 15 to 20 K come from engine waste heat that arises anyway, because the CHP units are generating electricity.
The sizing of the existing machines shows this: each of the two heat pumps delivers 300 kW of heat while drawing 85 kW of electrical power. That corresponds to a coefficient of performance of about 3.5 – a figure an air-source heat pump does not reach in winter.
For the planned expansion, the consulting engineers analysed the outlet over a full year. The figures are instructive because they show how to size a heat source properly: not by the average, but by the minimum.
| Design case | Flow rate | Source capacity | Heat output |
|---|---|---|---|
| Minimum, continuous operation | 60 l/s | 1,250 kW | approx. 2,000 kW |
| Usable average | 75 l/s | 1,600 kW | approx. 2,400 kW |
| In use today | — | approx. 400 kW | approx. 600 kW |
Both values assume cooling by 5 K. Anyone designing for the usable average must be able to throttle the plant during low-flow hours; anyone designing for the minimum gives away potential. The third row is the striking one: roughly a quarter of what the source could provide is currently in use.
In the Steinhäldenweg development there is a second, cold network. It is not fed from the heating plant but through a heat exchanger from the return line of the warm network. Flow temperature there is about 18 °C; every building has its own heat pump.
This is more than an elegant use of leftovers. Taking heat out of the return lowers its temperature – and a colder return improves the efficiency of the CHP units in the main network. The cold network is therefore not an add-on; it improves the system it hangs on. The primary energy factor stated for this sub-network is 0.1.
A heat network loses heat through the pipe wall, regardless of how much is flowing through it at the time. For Ilsfeld these distribution losses were put at around 22 per cent. That sounds like a lot, and the obvious suspicion would be a leak.
The investigation reached a different conclusion: the losses are explicitly not attributable to leakage, but to heat density per metre of route – that is, how much heat is actually drawn off per metre of pipe.
This is the transferable lesson from Ilsfeld, and it applies to any heat network: a metre of pipe with two customers loses about as much as a metre of pipe with six. It is not the length of the network that determines efficiency, but the connection density along that length.
In concrete terms: some 22.6 km of main route serve 421 building connections. A further 177 connections have already been built but are not yet in use – pipes laid to the property line as a precaution during road works. Every one of those that goes into service improves the balance of the entire network without adding a single metre of route.
For judging projects like this, the sequence over time says more than any snapshot.
| Year | Step |
|---|---|
| 2011 | First study presented to the council. Of four options – gas CHP, wood chips, pellets, treatment plant – the treatment plant option is pursued: it is expected to cover 84 % of demand. |
| 2012 | First public information evening. The concept of wastewater heat pump plus CHP already stands as it would later be built. |
| 2013 | Decision in principle and construction resolution; the first section goes into operation in November. |
| 2014 | Decision in favour of the wastewater heating plant over a wood chip plant. |
| 2019 | The heat pump plant starts operating. |
| 2019–2021 | Three CHP units are added one after another. |
| 2022 | Pellet boilers at the outdoor pool take over the winter mid-load. |
| 2026 | Resolution for a photovoltaic array on the roof of the heat pump plant. |
The renewable share in the network stood at 62 per cent in 2024. In 2019 it was 13 per cent.
The heat pumps need drive power, and so far that has come mostly from the CHP units at the same site – that is, from natural gas. This is exactly where the latest step comes in: a photovoltaic array of around 52 kWp is to be built on the roof of the heat pump plant, its electricity going directly to the heat pumps and the heat exchanger pumps.
The figures are honest and therefore instructive: over twelve months the plant drew around 193,000 kWh of electricity at a peak load of 261 kW. The planned array will produce about 53,000 kWh a year, of which roughly 40 per cent is consumed on site. That puts self-sufficiency at about 11 per cent.
Eleven per cent sounds modest – and is still the right move. A roof of some 287 m² cannot cover an annual consumption of 193,000 kWh; that is physics. What matters is that every self-generated kilowatt-hour here replaces one from natural gas: the electricity is not pushed into the grid but converted into heat on the spot. That is sector coupling in the literal sense.
Few people have their own treatment plant – but three principles transfer:
Finding out how this behaves in your own house takes data above all: flow and return temperatures, power draw, yields, all over time. That is exactly what local energy monitoring is for.
In Ilsfeld the treated wastewater averages around 10 °C over the year. The value is remarkably stable because the water comes from heated buildings.
Because it means the heat pump never has to reach the full network flow temperature. It raises the wastewater to 60 to 65 °C, and the CHP units then lift it to 75 to 80 °C. The smaller temperature lift improves the heat pump's efficiency considerably.
The wastewater is cooled by 4 to 5 kelvin before it flows into the Schozach. Extraction takes place downstream of secondary clarification, so any effect on biological treatment is ruled out. In summer the cooling tends to benefit the watercourse.
Every pipe gives off heat to the surrounding ground, regardless of the quantity flowing through it. Distribution losses of around 22 per cent were determined for Ilsfeld. According to the investigation the cause is not leakage but heat density per metre of route – that is, the number of customers per metre of pipe.
A network at a much lower temperature, around 18 °C in Ilsfeld, in which every building has its own heat pump. There it is fed from the return line of the warm network, which at the same time lowers that network's return temperature.
All technical figures in this article come from publicly available documents of the municipality of Ilsfeld and from an official register. They were compiled in September 2026; the key figures of a heat network change from year to year. The source documents are in German.
This article is a technical account, not an official statement. Binding information on connection, availability and terms is provided solely by the municipal heat utility of Ilsfeld.
Want to know how efficiently your heat generation actually works – with real measurements instead of datasheet promises? Send me a message – the first conversation is free.