Section 54(2) ElWG: who in Austria may still object to 15-minute smart meter data

With its new Electricity Industry Act, Austria has turned the smart meter rule around. Until December 2025 the grid operator could only read 15-minute values with consent. Since 24 December 2025 they are the default, and only households without photovoltaics, battery storage, heat pump, charging point or dynamic tariff at the metering point may object. What section 54(2) actually says, what is still transmitted after an objection, and why the customer interface is the really interesting part for Home Assistant.

Act
Elektrizitätswirtschaftsgesetz (ElWG), BGBl. I No. 91/2025, in force since 24.12.2025
Default
smart meters record and transmit 15-minute values (section 54(1))
Objection
only households without PV, storage, heat pump, charging point, dynamic tariff, energy community
Exception
micro-generation up to 0.8 kW (balcony solar) does not block an objection
Always transmitted
meter reading, monthly values, highest monthly 15-minute power value
Home Assistant
customer interface under section 52, enabled free of charge
Status
October 2026 · primary sources below, with the date each was checked
Author
Julian Haag, state-certified electrical engineering technician

The essentials in one minute

What was enacted

The Electricity Industry Act, also called the “Günstiger-Strom-Gesetz” (cheaper electricity act) during the legislative process, replaces the Electricity Industry and Organisation Act 2010 (ElWOG 2010). The National Council passed it in December 2025 by 116 votes to 47; the Greens' support secured the required two-thirds majority. It was promulgated on 23 December 2025 as BGBl. I No. 91/2025 and has been in force since 24 December 2025. The provisions on smart meters are in Part 4, the read-out rules in section 54.

Before and after: ElWOG 2010 and ElWG

A comparison with the old law shows how big the step is. Under section 84a ElWOG 2010, reading 15-minute values was “only permitted with the express consent of the final consumer or to fulfil obligations under a supply contract chosen by the customer that is based on 15-minute values”. Anyone who refused the smart meter altogether got, under section 1(6) of the smart meter introduction ordinance (IME-VO), a device that stores and transmits “no monthly, daily or 15-minute values”.

Section 54(1) ElWG reverses this: smart meters “record, store and transmit […] all 15-minute energy values, separately for feed-in and withdrawal”. The objection in subsection 2 is the exception, and it comes with conditions.

Smart meters in Austria: old and new rule
QuestionElWOG 2010 (until 23.12.2025)ElWG (from 24.12.2025)
15-minute valuesonly with consent (opt-in) or under a matching supply contractdefault, separately for withdrawal and feed-in
Refusingsmart meter could be refused, then no monthly, daily or 15-minute valuesobjection to daily and 15-minute values, only without PV, storage, heat pump, charging point etc.
Despite refusalmeter reading and, if technically possible, the highest 15-minute power in the calendar yearmeter reading, monthly values, highest monthly 15-minute power value

Who may object under section 54(2)

The subsection starts generously: household customers “are entitled to object to the grid operator storing and transmitting daily and 15-minute energy values”. Then come the conditions. The right only exists as long as, at the metering point,

If even one condition is not met, there is no right to object. For the readers of this site that means in practice: anyone with a PV system, home battery, wallbox or heat pump gets 15-minute values whether they want them or not. Netz Niederösterreich lists the “notifiable devices” PV system, heat pump, EV charging station and battery storage.

Checklist: objection under section 54(2) ElWG Four questions for household customers with a smart meter, one below the other. First: supply contract with dynamic energy prices under section 22? Second: feed-in via a direct line or prepayment function under section 29? Third: heat pump, charging point, storage or generation system at the metering point? Fourth: energy community or other shared energy use? Every yes leads to: no objection, 15-minute values are transmitted. Four times no leads to: objection possible; no daily or 15-minute values, but meter reading, monthly values and the highest monthly 15-minute power value remain. Footnote: also further installations specified by ordinance; except micro-generation up to 0.8 kilowatts under section 77. Household with smart meter Supply contract with dynamic energy prices (s. 22)? no Feed-in via a direct line or prepayment (s. 29)? no Heat pump, charging point, storage or generation? * no Energy community or other shared energy use? no yes yes yes yes No objection 15-minute values are transmitted Objection possible no daily or 15-minute values; what remains is the meter reading, monthly values and the highest monthly 15-minute power value * also further installations specified by ordinance; except micro-generation up to 0.8 kW (s. 77)
The four conditions of section 54(2) ElWG as a checklist. A single yes is enough to remove the right to object.

After a valid objection, the grid operator must “configure the meter so that no daily and 15-minute energy values are stored and transmitted”. Netz Niederösterreich accepts the objection in writing or by e-mail, Wiener Netze likewise by e-mail or post.

Balcony solar: the 0.8 kW exception

The clause “except installations under section 77” is decisive for balcony solar. Section 77 deals with micro-generation, and section 6 ElWG defines it as “one or more power generating units whose maximum capacity totals no more than 0.8 kW per installation at a grid user's point of transfer”. A plug-in solar device of this size therefore does not take away the right to object.

Under section 77(1), grid operators may not assign such installations their own metering point; under subsection 3 the operator gets one on request anyway. Anyone bringing more than 0.8 kW to the point of transfer operates an ordinary power generation system and can no longer object.

What is transmitted despite an objection

An objection does not turn the smart meter back into an old Ferraris meter. Section 54(2) goes on: “It must in any case be possible to read and transmit the meter reading required for billing purposes or for consumption allocation. The monthly values and the highest monthly 15-minute power value must be measured, read for billing purposes and transmitted; they remain stored on the device for 15 months.”

This also affects everyone who refused their meter under the old law. For devices configured under section 1(6) IME-VO, the transitional provision in section 189(21) ElWG applies this last sentence “six months after promulgation”, i.e. since June 2026. E-Control sums it up briefly in its consumer briefing on the ElWG: the highest 15-minute power value must “ALWAYS” be measured.

And anyone with a PV system who is still in the old opt-out setting will be switched over. Wiener Netze writes that as a first step all customers were switched who consume more than 5,000 kWh a year or operate “e.g. a heat pump, a charging point or […] a generation system”.

Daily instead of 15-minute values: the steps until 2027

Households without the installations named above get a second relief besides the objection. Section 54(3) allows the grid operator to transmit only daily energy values instead of 15-minute values, “without prejudice to the end customer's right to request 15-minute reading and transmission”:

  1. “until 31 December 2026 for end customers with an annual consumption of up to 5,000 kWh”,
  2. “from 1 January 2027 for end customers with an annual consumption of up to 1,500 kWh”.

The highest monthly 15-minute power values must “in any case be read and transmitted” here too. The deadlines are extended by six months if the prerequisites for 15-minute transmission are missing. Grid operators that had already equipped at least 70 % of their metering points with smart meters by the end of 2019 can apply to E-Control for a longer deadline under subsection 4.

Timeline: smart meter data in Austria from 2025 to 2027 Five stages one below the other. Until 23 December 2025, ElWOG 2010: 15-minute values only with consent, smart meter could be refused. 24 December 2025, ElWG in force: 15-minute values are the default, objection only without PV, storage, heat pump, charging point. June 2026: meters refused earlier also deliver monthly values and the highest monthly 15-minute power value. Until 31 December 2026: daily instead of 15-minute values allowed up to 5000 kilowatt hours annual consumption, pure consumers only. From 1 January 2027: threshold 1500 kilowatt hours. Below, the note: deadlines are extended by six months if the prerequisites are missing. until 23.12.2025 ElWOG 2010 15-min values only with consent; smart meter could be refused 24.12.2025 ElWG in force 15-min values default; objection only without PV, storage, heat pump, charging point, dynamic tariff June 2026 Section 189(21) old opt-out meters also deliver monthly values and the highest monthly 15-min power value until 31.12.2026 Daily values allowed up to 5,000 kWh a year, pure consumers only from 01.01.2027 Threshold drops daily values only up to 1,500 kWh a year Deadlines +6 months if prerequisites are missing (s. 54(3))
What changes for metering data with the ElWG. The data come from sections 54 and 189(21) ElWG and from section 84a ElWOG 2010.

The customer interface: readings for Home Assistant

Those who lose the right to object anyway can at least get something out of the smart meter themselves. Section 52 ElWG obliges grid operators, “at the request of an end customer or a feed-in operator, to make available via a unidirectional communication interface of the smart meter all readings recorded in that device”, and “in near real time”. Enabling the interface and its specification must be provided “without discrimination and free of charge”.

These data do not pass through the grid operator; they flow straight from the meter into your own network. For an energy dashboard, surplus charging or zero export, this is the best measuring point there is: it is the meter you are billed by. What the interface looks like depends on the grid operator and the meter type:

Customer interface at two large grid operators
Grid operatorInterfaceKey
Netz NiederösterreichP1, wired M-Bus to EN 13757-2, RJ12 socket, 2,400 baud, every five secondsform or e-mail to the grid operator; encrypted file by e-mail, password by SMS, within two weeks
Wiener Netzeoptical, infrared reading adapter to IEC 62056-21web portal: Anlagen & Verträge › Anlagendaten, select metering point, switch on; the key is then shown there

Both grid operators state explicitly that they do not offer adapters and provide no support for the customer's solution. Netz Niederösterreich advises checking compatibility lists. If you would rather not pick up a soldering iron, Oesterreichs Energie, the association of the Austrian electricity industry, publishes instructions for the Smart-Meter-Adapter: it plugs into the customer interface, decrypts in the device and provides the values over Wi-Fi “via JSON API, MQTT or Modbus TCP”. According to the manual it supports “all common smart meters of the Austrian grid operators” and does not connect to the internet on its own. Home Assistant accepts MQTT directly.

Netz NÖ: ESP32 and ESPHome on the P1 socket

The do-it-yourself route is short, because ESPHome has had a ready-made component for this for a while: dlms_meter. It listens to the meter, decrypts the telegrams with the grid operator's key and creates the values as sensors in Home Assistant. The documentation calls for “an adapter (like an M-Bus to UART module)” and explicitly recommends an ESP32; ESP8266 boards are unsuitable for large telegrams. It lists the Netz NÖ P1 interface as a tested configuration.

From the Netz NÖ smart meter to Home Assistant Four boxes one below the other. First the smart meter with customer interface P1: RJ12 socket, pin 3 M-Bus plus, pin 4 M-Bus minus, sends encrypted every five seconds at 2400 baud. Arrow: two-wire M-Bus to EN 13757-2. Second an M-Bus slave module that converts the M-Bus to UART. Arrow: UART. Third an ESP32 with ESPHome and the dlms_meter component, which decrypts with the grid operator's 32-hex-character key. Arrow: Wi-Fi, ESPHome API. Fourth Home Assistant with power for import and export and the meter readings. Below, the alternative without soldering: the Smart-Meter-Adapter from Oesterreichs Energie with Wi-Fi, JSON, MQTT or Modbus TCP. Smart meter · customer interface P1 RJ12: pin 3 = M-Bus +, pin 4 = M-Bus − every 5 s, 2,400 baud, encrypted (DLMS/COSEM) two-wire M-Bus (EN 13757-2) M-Bus slave module converts the M-Bus to UART (TTL) UART ESP32 with ESPHome (dlms_meter) decrypts with the grid operator's key (32 hex characters) Wi-Fi, ESPHome API Home Assistant import/export power, meter readings A+ and A− Without soldering: Smart-Meter-Adapter (Oesterreichs Energie) on the P1 socket, delivers JSON, MQTT or Modbus TCP over Wi-Fi
How the readings travel at Netz Niederösterreich. Pin assignment, baud rate and interval come from the grid operator's leaflet, the ESPHome component from its documentation.

The configuration for Netz NÖ is taken from the ESPHome documentation; only the UART block and four sensors for the energy dashboard have been added here:

uart:
  id: uart_dlms_bus
  rx_pin: GPIO16        # ESP32 pin the module is connected to
  baud_rate: 2400       # fixed, according to Netz NÖ

dlms_meter:
  id: dlms_meter_hub
  uart_id: uart_dlms_bus
  decryption_key: !secret netznoe_key
  custom_patterns:
    - pattern: "L, TSTR"
      name: "MeterID"
      default_obis: "0.0.96.1.0.255"
    - pattern: "F, TDTM"
      name: "DateTime"
      default_obis: "0.0.1.0.0.255"

sensor:
  - platform: dlms_meter
    dlms_meter_id: dlms_meter_hub
    obis_code: "1.0.1.7.0.255"
    name: "Grid import power"
    unit_of_measurement: "W"
    device_class: power
    state_class: measurement
  - platform: dlms_meter
    dlms_meter_id: dlms_meter_hub
    obis_code: "1.0.2.7.0.255"
    name: "Grid export power"
    unit_of_measurement: "W"
    device_class: power
    state_class: measurement
  - platform: dlms_meter
    dlms_meter_id: dlms_meter_hub
    obis_code: "1.0.1.8.0.255"
    name: "Grid import meter reading"
    unit_of_measurement: "Wh"
    device_class: energy
    state_class: total_increasing
  - platform: dlms_meter
    dlms_meter_id: dlms_meter_hub
    obis_code: "1.0.2.8.0.255"
    name: "Grid export meter reading"
    unit_of_measurement: "Wh"
    device_class: energy
    state_class: total_increasing

The units come from the Netz NÖ leaflet: active energy A+ and A− in Wh, instantaneous power in W. The pin is a placeholder; any further UART settings the module needs are in its data sheet. Netz NÖ only states the baud rate. The key goes into ESPHome's secrets.yaml. If you are unsure which values your meter sends, temporarily set the component's log to VERBOSE; ESPHome then lists every recognised OBIS code with its value.

Older guides set provider: netznoe and fixed keys such as voltage_l1. The documentation marks both as deprecated, and they are removed in ESPHome 2026.11.0. If you have such a configuration, switch to obis_code and the custom_patterns above.

How the two meter readings become a clean energy dashboard is covered in Long-term data in Home Assistant, and what to do with the export power as a control variable in Zero export with Home Assistant.

And in Germany?

None of this applies there. The ElWG is an Austrian federal act; in Germany the Metering Point Operation Act (Messstellenbetriebsgesetz) governs the installation of smart metering systems and the transmission of readings, with its own rules and deadlines. What applies to heat pumps and wallboxes there is covered in the articles on section 14a EnWG. For Home Assistant the measuring point is the same in both countries: the grid connection.

Frequently asked questions

Can I still object to 15-minute metering if I have a PV system?

No. Under section 54(2) ElWG the right to object only exists if no heat pump, charging point, energy storage system or power generation system is assigned to the metering point. A PV system is a power generation system. The only exception is micro-generation under section 77 with at most 0.8 kW at the point of transfer.

Does balcony solar prevent an objection?

Not as long as it counts as micro-generation. The ElWG defines this as one or more generating units with a combined maximum capacity of no more than 0.8 kW per installation at the point of transfer. Section 54(2) expressly excludes such installations. Anyone who connects more loses the right to object.

What does the smart meter still transmit after an objection?

The meter reading needed for billing and consumption allocation, the monthly values and the highest monthly 15-minute power value. These remain stored in the device for 15 months. Daily and 15-minute values are neither stored nor transmitted after a valid objection.

Without a PV system, will my 15-minute values be transmitted automatically?

Not immediately. For pure consumers, section 54(3) ElWG allows only daily values to be transmitted up to 31 December 2026 at an annual consumption of up to 5,000 kWh, and from 1 January 2027 at up to 1,500 kWh. The deadlines are extended by six months if the prerequisites are missing. You can request 15-minute transmission at any time.

How does smart meter data get into Home Assistant?

Through the meter's customer interface. Under section 52 ElWG the grid operator must enable it free of charge and provide the key. At Netz Niederösterreich it is an M-Bus socket that sends an encrypted data set every five seconds; an ESP32 with ESPHome and an M-Bus module, or a ready-made adapter, decrypts it locally.

Does section 54 ElWG also apply in Germany?

No. The ElWG is an Austrian federal act. In Germany, the Metering Point Operation Act (Messstellenbetriebsgesetz) governs the installation of smart metering systems and the transmission of their data, with its own rules.

Sources

All statements come from the following acts, ordinances and documents from grid operators, the regulator and manufacturers, each with the date it was checked. Legal texts as published in the Austrian federal legal information system (RIS). Quotations from German documents are my translation.

This article is not legal advice. The legal text in the RIS and the information from your grid operator are authoritative. The customer interface is intended for connection by the customer; only the grid operator or a qualified electrician works on the meter itself and in the meter cabinet.